Town Center L2B3-LR050222GEOTECHNICALAND ~ R I'--I I i p
ENVIRONMI~NTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Village at Town Center
240 N. Denton Tap Road
Coppell, Texas
REPORTED TO: CTC-Viliage at Town Center, Ltd.
12201 Merit Drive, Suite 170
Dallas, Texas 75241
ATTN: Mr. Alen Hinckley
CONTRACTOR: HCI General Contractors
REPORT NO. 53
REPORT DATE: 02-22-05
REG PROJECT NO. 11453
DATE OBSERVED: 02-04-05
TECHNICIAN: G. Green
PAGE: 1 of 1
Items Observed: I Paving: of N.W. corner of 168'S, 14'W, N.E Bldg corn,,~~
168'S, 14'E, 18'N, 36'E of the N.W. bldg corner
/
Reference Plans or Notes Used: J Sheet A-5
J~-lthere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents,
Mail
Distribution: (1) CTC-Village at Town Center, Ltd./
Mr. Alen Hinckley
(1) HCI General Contractors/
Mr. Mark Nelon
(1) Daniels & Associates Architects/
Mr. Randy Daniels
(1) UBSE/Mr. Gary Ten Eyck
(1) AECC, Inc./Mr. Chad Stephens
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Ronald F. Reed, P.E.
2424 STUTZ DR. * SUITE400 · DALLAS, TX75235 ,, TEL[214]3505600 · ~^X [2141350 0019