Loading...
TexasBank 2R-CS050223 (2)82/23/~00~ !S:i~ 7835~88891 PS~5 P&~E 81/87 Facsimile Transmission Form Date: February 23, 2005 ~ pages including cover p~3ge--~'- 'to: . kett / Brian Buck,(slz) 447-8156, / Location: Project Solutions Group 580 Herndon Parkway, Suite 500 Herdon, VA 20'170 Fax Number: (703) 668-0091 Voice Number: (703) 563-0495 Email: ssiegfried~projsolgroup.com Cc: Keith Marvin, 972-304-3570 Reference: Coppell, TX - Engineering Department Inspection Fee~ Comments: Bob, enclosed is the subject fee calculation sheet and required backup documentation for the calculations. Please prepare a check payable to the City of Coppell in the amount of $8,674.00 and forward to Brian Buck, Workman, who will submit the application and fee payment. Brian, Engineering will accept the application and get all ready to go pending payment of fees, submission of Plat to the City and scheduling the pre-construction meeting..When you receive the check from Cr~me, please submit the application with check and schedule the meeting. Advise me of meeting time and date in case I can attend. I will track down the Plat (that may already have been submitted).