Loading...
ST9301-CS050225 (2) T H £ · C I T Y . 0 F 'CDPPEi L February 25, 2005 (Letter sent to 289 / list attached) CONSTRUCTION NOTICE RE: East Sandy Lake Road Project #ST 93-01 Dear Coppell Resident or Property' Owner: Beginning the week of March 14, 2005, construction is scheduled to begin on East Sandy Lake Road, from Kimbel Kourt to the east city limit line. The project consists of the reconstruction of the existing 2-1ane asphalt roadway to a 4-lane divided roadway with improved drainage. City Council a~varded the contract for the construction of this project to Tiseo Paving Company in December 2004 and it is scheduled to take approximately 480 days. Two-way traffic will be maintained at all times. However, you may experience construction delays and inconveniences beginning March 2005 through June 2006. If you have any questions or need any additional information, please feel free to call Garreth Campbell, Construction Inspector, at 972/304-3685 or Suzan Taylor, CIP Coordinator, at 972/304-7019. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering / Public Works Office 972/304-3686 Fax 972/304-7041 e-mail kgfiffin~ci.coppell.tx.us