Loading...
Freeport NIP(8.0)-LR050225Client: Project: Services: neers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 6~0-9745 CONCRETE COMPRESSIVE STRENGTH TEST Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Freeport XI & XII ~ Coppell, Texas Report No.: 226913 Project No.: 049245 Date of Service: 01/26/2005 Report Date: 02/25/2005 Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive sixength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: co~rrRAcrog: Duke Construction CONCRETE SUPPLIER: Southern Star PLANT: 27 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 4" - 6" 3%-5% ASTM C-172 ASTM C-31 ASTM C- 143 ASTM C-231 ASTM C-1064 ASTM C- 1231 ASTM C-39 MEASURED MIX DESIGN I.D.: 7752 SLUMP PLACEMENT DATE: 01/26/2005 (inches) WEATHER CONDITIONS: Clear 5.25 TIME SAMPLED: 3:30am BATCH TIME: 2:55am TEMPERATURE (F)- AIR 46 V CONCRETE: 66 E TaUCK ~O: 1827 TICK~TNO: 782207 AIR CONTENT (%): 4.5 UNIT WEIGHT (pcf): NA OVERALL pLACEMENT LOCATION: Paving, south side Building XI drive around, parking southwest comer of Building 53 (blockouts), east side Building XI SAMPLE LOCATION: REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" 120' east, 20' north from southwest comer CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 I 02/02/2005 7 6.00 28.26 111090 3930 Unbonded Cap 1 2 02/23/2005 28 6.00 28.26 136840 4840 Unbonded Cap 1 3 02/23/2005 28 6.00 28.26 137370 4860 Unbonded Cap Average 4850 1 4 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feataire of similar subject matter provided by persons or conditions over which we have no control. Our letters and repo~s are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01SS Page I of 5 ineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Report No.: 226913 Project No.: 049245 Date of Service: 01/26/2005 Report Date: 02/25/2005 Project: Freeport XI & XII Coppell, Texas ~~ Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compr~treng xnple;~nd bring samp|esbackt°thelab°rat°ryf°rcuHngandtesti~§i:~cc°r~:c;wi:::lilablestandards'~ j MIX BESmN ED.: 7752 /~t//~/l~ . MEASURED PLACEMENTOATE: 01/26/20(~i~,~__/ SLUMP(inch.) WEATHER CONDITIONS: Clca~ ~ 6.0 TIME SAMPLED: 5~30~Lm BA%TCH TIME: 4:10~3rl CONTRACTOR: Duke Construction CONCRETE SUPPLIER: Southern Star PLANT: 27 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 4" - 6" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C- 1231 ASTM C-39 STRENGTH: SLUMP (in): AIR (%): TEST METHOD: TEMPERATURE (17). AIR 46 F CONCRETE: 64 F TRUCK NO: 1840 TICKET NO: 782216 AIR CONTENT (%): 4.9 UNIT WEIGHT (pc0: NA OVERALL PLACEMENT LOCATION: Paving, south side Building XI drive around, parking southwest comer of Building (blockouts), east side Building XI SAMPLE LOCATION: REPORT OF TESTS 100' west, 30' north from southeast Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (scl.in.) (lbs. force) (psi) TYPE 2 1 02/02/2005 7 6.00 28.26 97450 34~ Unbonded Cap 2 2 02/23/2005 28 6.00 28.26 124760 ~ Unbonded Cap 2 3 02/23/2005 28 6.00 28.26 124150 Unbonded Cap Average 2 4 Hold Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject maiter provided by persons or conditions over which we have no control. Our lc'acrs and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fi~ll without the wrltl, en approval of Rone Engineers, Ltd. 01SS Page 2 of 5 ineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214} 630~9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Project: Freeport XI & XII Coppell, Texas Report No.: 226913 Project No.: 049245 Date of Service: 01/26/2005 Report Date: 02/25/2005 Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive stxength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Duke Construction CONCRETE SUPPLIER: Southern Star PLANT: 27 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 4" - 6" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C- 1231 ASTM C-39 MIX DESIGN I.D.: 7752 M~ASURED PLACEMENT DATE: 01/26/20~ SLUM~(inches) WEATHER CONDITIONS: C~ ~ ] 5.75 IIMESAMI'LED: 7:00am/~ BA~TIME: 6215am TEMPEP, ATVRE {E) - AIR ,~ ~, ~NC~Em 66 TRUCKNO: I l lqYrN°: 782225 AIR CONTENT ('/.l: OVERALL PLACEMENT ~O~l~N parking southwest comer of Building Paving, south side Building ~ive (btockoats), east side Buildin~ SAMPLE LOCATION: ~0' west, 40' north from southeast comer REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 3 1 02/02/2005 7 6.00 28.26 106250 ~ Unbonded Cap 3 2 02/23/2005 28 6.00 28.26 129960 ~ Unbonded Cap 3 3 02/23/2005 28 6.00 28.26 129500 Unbonded Cap Average 4590 3 4 Hold Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for vahation in quality (composition, appearance, performance, etc.) or any other feature of similar subject mailer provided by persons or conditions over which we have no control. Our lc'acrs and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01SS Page 3 of 5 Client: ineers Duke Realty Services, LP Mr. Brian Sa'aley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Project: Freeport XI & XII Coppell, Texas 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: 226913 Project No.: 049245 Date of Service: 01/26/2005 Report Date: 02/25/2005 Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTraCTOR: Duke Construction CONCRETE SUPPLIER: Southern Star pIA~rr: 27 SPECIFICATION REQUIREMENTS STRENGTm 4000 psi ~ 28 Days SLUMP (in): 4" - 6" TEST METHOD: ASTM C-172 ASTM C-31 ~,~-~ 9 ~.2 ASTM C-143 ASTM C-231 ASTM C- 1064 ASTM C- 1231 ASTM C-39 MEASURED MIX DESIGN 1.D.: 7752 SLUMP PLACEMENT DATE: 01/26/2005 (inch.) WEATHER CONDITIONS: Clear 7.0 TI~MESAMPLED: 9:15am BATCHTIME: 8:50ali1 TEMPERATURE (F)- AIR 54 F CONCRETE: 67 F TmJOCNO: 8 TICK~TNO: 782238 AIR CONTENT (%): 5.0 UNIT WEIGHT (pc0: NA OVERALL PLACEMENT LOCATION: Paving, south side Building XI drive around, parking southwest comer of Building )~ Colockouts), e~st side Building Xl SAMPLE LOCATION: REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MARKED DATE AGE DIAMETER SET NO. TESTED (days) (inches) ,60'~/rth from southwest ~ COMPRESSIVE AREA STRENGTH FRACTURE (sq.in.) (lbs. force) (psi) TYPE 4 1 02/02/2005 7 6.00 28.26 97470 3450 Unbonded Cap 4 2 02/23/2005 28 6.00 28.26 120430 ~2~ Unbonded Cap 4 3 02/23/2005 28 6.00 28.26 122190 C~ Unbonded Cap Average 4 4 Hold Water added at site: 15 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject mat~er provided by persons or conditions over which we have no con~'ol. Our Ie~ers and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in f~ll without the written approval of Rone Engineers, Ltd. 01SS Page 4 of 5 Client: ineers Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Project: Freeport XI & XII Coppell, Texas 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: 226913 Project No.: 049245 Date of Service: 01/26/2005 Report Date: 02/25/2005 Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Duke Construction CONCRETE SUPPLIER: Southern Star PLANT: 27 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 4" - 6" 3%-5% ASTM C-172 ASTM C-31 ASTM C- 143 ASTM C-231 ASTM Co1064 ASTM C- 1231 ASTM C-39 MEASURED MIX DESIGN I.D.: 7752 SLUMP PLACEMENT DATE: 01/26/2005 (inches) WF~.THER CONDITIONS: Clear 5.5 TIME SAMPLED: ll:lSam BATCHTIME: 10:03am TEM~'ERATURE (F) - Am 64 F CONCRETE: 68 F mVCK NO: 1015 TIC~T NO: 782248 AIR CONTENT (%): 5.0 UNIT WEIGHT (pcl): NA OVERALL PI,ACEMENT LOCATION: Paving, south side Building XI drive around, parking southwest comer of Building XI (blockouts), east side BuiIdthg X1 SAMPLE LOCATION: REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" 30' west. 15' south from northeast CYLINDER MARKED DATE AGE SET NO. TESTED (days) 5 I 02/02/2005 5 2 02/23/2005 5 3 02/23/2005 5 4 Hold Technician: Nathan Witherell Report Distribution: (1) Duke Realty Services, LP (I) Extranet (1) City of Coppell (1) City of Coppall DIAM~TER (inches) 7 6.00 28 6.00 28 6.00 Started: 2:30am MAXIMUM COMI'RESSIVE AREA LOAD STRENGTH FRACTURE (sq.in.) (lbs. force) (psi) TYPE 28.26 1241d~ 4390 Unbonded Cap 28.26 ~1301l'~"~ '~:~ C Unbonded Cap 28.26 ~/B127J ~ Unbonded Cap 5350 Finished: "1:00pm ~ CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject mat~er provided by persons or conditions over which we have no control. Our letters and tepom a~ for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01SS Page 5 of 5