Loading...
TexasBank 2R-CS050307March 7, 2005 T H [ · C I T Y · 0 F COPPELL Chris Ripke Workman Construction Fax: 817/361-6863 RE: TexasBank Addition, Lot 2R Block A (Ct&ne de la Cr~me) Dear Mr. Ripke: A pre-construction conference on the referenced project has been scheduled for Wednesday, March 9th, 2005 at 10:00 a.m. in the Lobby conference room in Town Center at 255 Parkway Blvd. Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any other interested parties so that they may have a representative present. If you have any questions coneeming this project prior to the scheduled meeting, feel free to contact me at (972) 304-7090. Sincerely, Rick O'Dell, Conslx'uction Inspector Office Phone: 972-304-7090 Fax: 972-304-3570 Ken Griffin, Director of Engineering & Public Works Glenn Hollowell, Asst. Director of Public Works Greg Jones, Chief Building Official Lee Stone, Commercial Building Inspector Tim Oates, Fire Marshal RESPONSIBILITY FOR PRE-CONSTRUCTION MEETING NOTIFICATION The owner / owner's representative will be notified of the date, time and place of the pre-construction meeting once it is scheduled by the Construction Inspector assigned to the project. It is the owner / owner representative's responsibility to notify the fo/lowing parties: · Franchise Utilities (including but not limited to electric, gas, cable, & telephone providers) · Geotechnical firm · Project Engineer · Contractors or subcontractors for excavation, utility, & paving operations · SWPPP representative