Loading...
WA0101-CS050314COP?ELL March 14, 2005 Mr. Richard Gee GEE Consultants 1{)046 Monroe Drive Dallas, Texas 75229 RE: State Highway 121 Water Line WA 01-01 Construction Materials Testing Dear Mr. Gee: Enclosed please find a set of plans and specifications for the above referenced project. The project consists of the installation of +7900 linear feet of 12-inch PVC water line by open cut with embedment, and -+800 linear feet of 12-inch PVC water line in steel encasement by boring. The project is scheduled for the April 12, 2005 City Council meeting for consideration of a construction award. Please provide an estimate of the type and number of construction materials tests required for the project based on the construction plans and the City's standards, and submit a proposal for the testing. The contractor is responsible for payment of materials testing done before 8:00 a.m. and after 5:00 p.m., and for any re-testing. Your consideration of this matter is appreciated and should you have any questions or need any additional information, please advise. Sincerely, Suzan ¢. Taylor C.I.P. Coordinator Engineering Department Direct: 972-304-7019 Fax: 972-304-3570 E-mail: s[az[ol ~(c i coppc H .lx. u s Attachments