Ballet TX-CS050316 ¥ H E . ¢ I T Y · 0 F COPPEi [, March 16, 2005 Mr. Mark Wainscott Wainscott Companies 3030 LB J, Suite ~00 Dallas, TX 75234 RE: Ballet AcademyofTexas, Lot 1, Block A Fee Assessment Letter Dear Mr. Wainscott, Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. These fees were based on the assumption that the site will use a 1 1/2" Irrigation Meter, as this bit of information was not included with the revised set of Engineering Plans submitted to our office on March 15, 2005. Should the size of this meter be revised, these fees will also be revised. Please make payment for the Impact Fees to the City of Coppell in the amount of $1,883.95 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to filing of the final plat. Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the issuance of a Building Permit. Please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be paid prior to the scheduled pre-construction meeting. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Charlene La Matt~na, E I T Graduate Engineer CC: Jennifer Armstrong, Finance Director Mary Beth Spletzer, Administrative Secretary, Building Inspections Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official DEVELOPMENT FEE TABLE Project: Ballet Academy af Texas, Lot 1, Block A l)ate: 3/16/2005 TOTAL AMOUNT DUE FEES DUE PRIOR TO HI,lNG PI,AT \Vater Impact Fee $4,340.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $150.00 (100% due at Issuance of' Water Meter) \Vatcr Mctel' Fee (Domestic) S211.72 (100% due at Issuance of Water Meter) Water Meier Fee (In'igation/Firclmc/ S1,954.43 (1(10% due at Issuance of Water Mctel') Water Meter Deposit (Domeslic) $30.00 (100% due at Issuance of Water Meter) h-rigatiol~Fircline Meter Deposit $60.00 (100% dale at issuance of Water Meter) Wastewatcr Impact Fee $2,240.00 (100% due at Issuance of Building Permit) \Vastcwatcr Tap Inspection Fee $50.00 (100% duc at Issuance of' Building Permit) [ Itilily Final Inspection Fee $50.00 ( 100% due at Issuance of Building Pcmqit) Park Fcc S0.00 S0.00 (100% due prior to Filing Plat) Roadway Impact Fee $1,883.95 S 1 ,$$3.95 (100% duc prior to Filing Plat) Street Light Fee hd'ornaalion not Available (I 00% duc prior to Acceptance of' Project) Strccl Sign Fcc hflbrmat]on not Available ( 100% duc prior to Acceptance of' Project) Construction Inspection Fee hd'~)rmation not Available (100% duc prior o S art ol ( onstrt ct n) II TOTAL $10,970.10 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $1,883.95 DEVELOPMENTFEE WORKSHEET PROJECT: Ballet Academy t~f Te.x'as, Lot l, Block DATE: 3/16/2005 ~¥ater Impact Fee: Domestic Meter(s): 1 - 2 inch = 8 Irrigation Meter(s): 1 - 1 1/2 inch = 5 0 0 Fireline Meter(s): 1 - 6 inch 25 TotaL#: 15.5 ESU's@$28000ea (Due prior to issuance of building permit) XVater Tap Inspection Fee: Total #: 3 Connections @ $50 00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic XX, ater Meter Fee: Total #: 1 Domestic Meter(s) @ $211.72 (Single fanrily due prior to ~ssuance of building permit) (All other developments due prior to issuance of meter) lrrigation/Fireline 'Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $126.67 Total #: 0 Additional Irrigation Meter(s) @ $000 Total #: 1 Fireline Meter(s) @ $1,827.76 (100% due prior to issuance of water meters/ Domestic Water Meter Deposit Fee: Total fl: 1 Meter(s) @ $3000 ea (100% due prior to issuance of water metem) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) ~ $30 00 ea (100% due prior to issuance of water meters) ~Vastewater hnpact Fee: Total Domestic Meters ESU's: 8 (Due prior to issuance of building permit) @ $280 00 ea. X~astewater l'ap Inspection Fee: Total #: 1 Connections @ $5000 ea (100% due prior to issuance of building permit) Utility Filial Inspection Fee (All developments): Total #: 1 Lots @ $5000 ea. (100% due prior to issuance of building permit) ESU's ESU's ESU's ESU's $4,340 00 $150 00 S211 72 $126.67 $0.00 $1,827.76 $3000 $6O 00 $2,24000 S50 00 S50.00 Park Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat appreved: After October 26, 1993 0 Single family @ $0 00 per lot Multbfamily @ S0 00 per unit (100% paid prior to Council approval of final plat) $0 00 $000 $1,88395 Information not Available Roadway Impact Fee: (See attached fee calculations) Street 1,ighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after TU Electric subrnits the lighting plan for the proposed development Once the plans are submitted, $292.60 per light will be assessed (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment The contracts should indicate the cost to construct lhe m~provements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CAI.CULATIONS PII. OJ [C'I: ! ) A T E: Ballet Academy O! l'exa~', Lot 1, Block 4 3,/16/2 0 0 5 ROADWA. Y IMPACT FEE: Service Area * l Category ** hlstitutional Land [ se ** hlstitutlonal Others Nol Specified Building Asea (st) 11.214 I)ex elopment knits "* 112I Vehicle Miles per I)eveh)pmenl knit '* 0.56 Fcc per Vehicle Mile *** $300 Road~ay hnpactFce due (Dexc/opmcnt [ ntis) x (\chicle Miles per~' De\ elopment [ nit) x {Fee per Vehicle Mdc) $1,883.95 :' I Figure 2 Roadway Impact Fec Stud),) : * (laNe :~ - Roadway hnpact Fee Study) '** (Schedule 2. Page 3 - Road\\ay hnpact l:ee Stud~) [ ,t, uot,5¥rm;, : $1,883;95