Loading...
SS9901-CS050317Ken Griffin - Force main / lift stations From: Ken Griffin To: Clay Phillips; Jim Witt Snbject: Force main / li~ stations .Ihn/Clay We are currently having failure (cave-in) problems with the pit work for the new DeForest Road Lift Station. The lift station contractor's engineer has revisited the site and is reviewing their shoring design. We have asked the lift stalion contractor to cease work until the shoring plan has been modified. The contractor agreed. One problem tha! is complicatiog this issue is that the force main contractor (Mastec) is on the lift station site trying to complete their drilling so they can pull pipe. Mastec believcs that with any luck they could pull pipe this weekend. I havc authorized them to work this weekend and potentially pull pipe on Sunday. We do not like to have them working on Sunday but it is importm~t that they pull their pipe and get their equipment offthe lift station site so the cave-in issue can be adequately addressed. will keep you informed oFany additional changes.