Loading...
Belt Line Trade-CS050317 CITY OF COPPEI !. PI.ANNiNG DEPARTMENT STAFF REPORT CASE: Beltline Trade Center, Lot 1, Blk. 1, Minor Plat P & Z }IEARING DATE: C.C. 1 tEARING [)ATE: March 17, 2005 April 12. 2005 STAFF REP.: Gary L. Sieb, Planning Director LOCATION: North side of Beltline Road, approximately 1,000 feet east of North Lake Drive. SIZE OF AREA: 27.072 acres of property C[ IRRENT ZONING: 1.1 (I,ight Industrial) RI{Q[II':ST: Minor Plat approval to alloxx the de,, clopment ora 375.000-square- tbot warehouse distribution building. APPLICANT: HISTORY: Industrial Dev. International 5420 LBJ Freeway Suite 1275 Dallas, TX 75240 (972) 546-2640 Fax: (972) 546-2650 lh~gineer: Goodwin/Marshall, Inc. Edward EckarL P.E. 2405 Mustang Dr. Grapevine. TX 76051 (817) 329-4373 Fax: (817) 329-4453 In October of 2000, City Council approved a Preliminary Plat and a zoning change from LI (Light lndustriaI) to PD-189 to allow the dcvelopment of an indoor basketball/recreational facility (referred to as "lloop Town") on i7 acres of this 27 acre site. In December of that same year, Council approved an amendment to the PD to enlargc the recreational sile by approximately .7 of an acre to better address tree mitigation issues. The zoning was never legally changed, thc plat was never liled, and the project was never built. Item # 12 Page 1 of 3 TRANSPORTATION: Today, the property retains its Light Industrial zoning classification. Behlme Road is a P6D, six-lane divided thoroughfare built to stundard within a 120 foot right-olkway. SURROUNDING LAND USE & ZONING: North - Railroad; Creekview Add.; LI (Light Industrial) & SF-9-PD-104 South - North Lake, City of Dallas East - TXU Electric aud Gas right-of-way; LI (Light Industrial) West - Vacant; LI (Light Industrial) COMPREHENSIVE PLAN: The Comprehen,~ive Plan of May 1996 shows the property as suitable for light industrial uses. DISCUSSION: This is a companion piece to the Site Plan review of Beldine Trade Center, a 375,000-square-f;.)ot industrial building proposal. By approving this Miuor Plat, development of thc warehouse structure can proceed. Staff can support this request with two conditions, one from TXU, one from Engineering. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff recomlnends APPROVAL of this request, subject to the following conditions: 1. Please contact Jeff' Curry at (972) 570-4126 to discuss easement requirements. 2. Engineering easement comments (attached) ALTERNATIVES 1) Recommend approx al of the request 2) Recommend disapproval of the request 3) Recommend moditication oflhe request Page 2 of 3 Item # 12 ATTAC} tMENTS: 1 ) Minor I~lat document 2) Departmental comments (l,nginccring) Item # 12 Page 3 of 3 COP'I ELL P~roject ID MP 05~00D8 Address E Belt Line Rd CITY OF COPPELL 2nd DRC REPORT Project Name · H E c i · Y o F COPPELL Beltline Trade Center Lot 1, Block 1 Project Type Application Date Case Manaqer Proiect Description Minor Plat 2/15/2005 Gary Sieb To allow the development of an approximate 375000 square-foot warehouse distribution building on 27072 acres of properly Aqency Engineering 1 of 1 Comments 1 Coordinate easements to accommodate changes to the proposed water line. 2. Will need easement for the sanitary sewer when it leaves this site. Additional requirements may be identified during full engineering plan review CITY O1: COPPEI P1.ANNiNG DFPARTMENT STAFF REPOR~1 CASE: Beltline Trade Center, Lot Blk. Site Plan P & Z HEARING DA I-E: C.C. IIEARING DATE: March 17.2005 April 12, 2005 STAFF REP.: Gary L. Sieb, Planning Director I.OCATION: North side of Beltline Road, approximately 1,000' east of North Lake Drive. SIZE OF AREA: 27.072 acres of properU ~G' CURRENT ZONIN · LI (ISght Industrial) RFQUES'[: Site Plan approval to allow the development ora 375,000-square- lbot x~arehousc distribution bnilding. APPLICANT: Owner: Industrial Dev. International 5420 LBJ Frecx~a? Suite 1275 Dallas. TX 75240 (972) 546-2640 Fax: (972) 546-2650 Engineer: Goodwin/Marshall, [llC. Edward Eckarl, P.E. 2405 Mustang Dr. Grapevine, TX 76051 (817) 329-4373 }"ax: (817) 329-4453 HISTORY: In October of 2000, City Council approved a PrcliminaD' Plat and a zoning change i¥om Li (I,ight Industrial) to PD-189 to allow the development of an indoor basketball/recreational facili~' (referred to as "tloop Fown") on 17 acres of this 27-acre site. In December of that same year. Cotmcil approved an amendment to the PD to enlarge tho"recreational si~e by appro×imately .7 of an acre to better address tree mitigation issues. The zoning was never legally Item # 11 Page 1 of 3 chromed, thc plat was never lilcd, and the project was nexer built. Today. thc property retains its IJght Industrial zoning classificatkm. TRANSPORTATION: Beltline Road is a P6D, six-lane divided thoroughfare built to standard within a 120-foot right of way. SURROUNDING LAND USE & ZONING: North -Railroad, Creekview Add.. L1 (Light Industrial) and PDd04- SF-9 South North Lake, City of Dallas East - TXU Electric and Gas right of-way; LI (Light Industrial) West - Vacant; l.l (Light Industrial) COMPREttENSIVE PI.AN: The Comprehensive Plan of May 1996 shows the property as suitable for light industrial uses. DISCUSSION: As outlined in the ttlSTORY section of this report, there was a proposed recreational usc activity platmed for this property roughly four and one- half years ago. For a variety of reasons, those plans failed to materialize, and the property is still vacant. It retains a Light Industrial zoning classification and the current applicant is proposing a use recommended by the Com?rehensive Phm. One 375~000-square-foot warehouse building is requested by Industrial Development Iuternational (IDI), a company which has constructed a number nf similar buildings in Coppelh Their biggest project in the City is the DFW Trade Center located northwest of S.H. 121 and shared with the City of Grapevine. This particular building is typical of our current inventory of warehouse buildings and appears to meet most provisions of our ordinances. Where discrepancies have been found, appropriate corrective comments have been made, as reflected in the conditions for approval section of this report. Tile proposal retains a number of n-ecs on thc northern portion of the site, provides a detention pond to control water runoff and is providing parking at code. The design of the building is typical of our large warehouse structures, and the elevations approach the requirements of the Zollitlg Ordinance. The Landscape Plan meets our standards. Item # 11 Page 2 of 3 Plan discrepancies include a need to show and label fire hydrant locations on the Site Plan, as well as fire department co~mcctiuns. Also, thc applicant needs to dimension the width of parking spaces. Beltline Road median alterations must be approved by the City of Dallas. The Site Plan and Landscape Plan need to ret]¢ct a building fuotprint identical to the building's design, including the articulated portions of the structure. With regard to articulation, it appears that the architect has added articulation elements along Bcltline Road, but there is some question whether the 100- foot maximmn spacing has been met. Further discussion at the public bearing will clarify staff concern regarding this point. The Engineering Department has some concerns with this proposal but feels additional conversations will resolve those concerns, A condition of approval is compliance with Engineering comments. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff recommends APPROVAL of this request, subject to the conditions: following 1. Show and label all fire hydrants on Site Plan and reconfigure Fire Department connection locations to the satisfaction of the Fire Department. Dimension width of parking spaces on Site Plan. 3. Beltline Road median alterations must be approved by tbe City of Dallas. 4. Site Plan and Landscape Plan need to reflect a building footprint in compliance with thc building design. 5. Clarify building articulatinn design dimensions. 6. Cmnpiiance with Engineering corrunents (attached). ALTERNATIVES 1) 2) 4) Recommend approval of the request Recommend disapproval of the request Recommend modification of the request Take under advisement tbr reconsideration at a latcr date. ATTACHMENTS: 1) Site Plan, L ndscape Plan, Trcc Survey Plan. Pcrspectivc Drawings 2) De artmcntal comments {Fire Administration & lSlminccring) p ~ Item// 11 Page 3 of 3 coPPELL Proi*ct ID S~A 05~0007 Address E Belt Line Rd CITY OF COPPELL 2nd DRC REPORT ~roiect Name COPPELL Beltlir]e Trade Center, Lot 1, Block 1 Project Tvpe Application Date Case Manacler Project Description Site Plan Approval 2/15/2005 Gary Sieb To allow the development of an approximate 375,000-square foot warehouse distribution building on 27 072 acres of property Aqency Fire Admin Engineering 1 of 1 Comments 1 FDC configuration is not correct Install in accordance with NFPA and City of Coppell standards Preliminary Utility Layodt 1 Additional fire hydrants are needed to meet minimum spacing (300' min along fire lane) 2. Overall design of water will be reviewed in greater detail during plan review 3 You wilI need permission from DART to work within their easement to install the 8" sanitary sewer Additional requirements may be identified during full engineering plan review