March 22, 2005
Dayton Macatee, P.E.
Macatee Engineering
6440 N. Central Expressway, Suite 414
Dallas, TX 75206
FAX 214/373-6580
RE: Coppell Trade Center/Lot 1, Block 1
Preconstruction Meeting
Dear Mr. Macatee:
A pre-construction conference on the referenced project has been scheduled for March
24, 2005, at 2:00 p.m. in the second floor conference room in Town Center at 255
Parkway Blvd.
Please notify the franchised utility companies, contractors, sub-contractors, testing lab
and any other interested parties so that they may have a representative present. If you
have any questions concerning this project prior to the scheduled meeting, feel free to
contact me at (972) 304-3684.
Sincerely,
Office Phone: 972-304-3684
Fax: 972-304-3570
cc:
Ken Griffin, Director of Engineering & Public Works
Glenn Hollowell, Asst. Director of Public Works
Greg Jones, Chief Building Official
Lee Stone, Commercial Building Inspector
Tim Oates, Fire Marshal
RESPONSIBILITY FOR PRE-CONSTRUCTION
MEETING NOTIFICATION
2
The owner / owner's representative will be notified of the date, time and place of
the pre-construction meeting once it is scheduled by the Construction Inspector
assigned to the project.
It is the owner/owner representative's responsibility to notify the following
parties:
· Franchise Utilities (including but not limited to electric, gas, cable, &
telephone providers)
· Geotechnical firm
· Project Engineer
· Contractors or subcontractors for excavation, utility, & paving operations
· SWPPP representative
HP LaserJet
HP LASER=lET 3200
Mar 22-2005 l:18PM
Fax Call Report
3330
Job Date Ti me Type
600 3/22/2005 1:17:44PM Send
Identi fi cation
2143736580
Duration
0:58
Pages
2
Result
OK
CoPP[