TC Bank-CS050318From: To: Date: Subject: Keith Marvin Bobby. Kubin@kimley-horn.com 3/18/2005 8:17:30 AM Re: Town Center Bank Drainage Issue Bobby, I have two issues that need consideration for your proposed drainage resolution: 1. I don't think simply grouting the throat openings will work on the existing inlet. You may need to remove the entire top and re-form the top of the box. Instruct the contractor to work with the city's inspector for an appropriate closure of the existing inlet. 2. Ensure adequate grading is done to direct the runoff to the new inlet location. Coordinate any modifications to this submittal with the city inspector, and ensure these changes are reflected on the as-built plans. Feel free to call with any questions or comments. Keith R. Marvin, P.E. City of Coppell (972) 304-7044 kmarvin@ci.coppelLtx.us >>> <Bobby. Kubin@kimiey-horn.com> 3/17/2005 1:35:58 PM >>> Keith, Attached is the drainage revision for the Town Center Bank Project on Denton Tap per my voice mail. The existing wye inlet elevation is about 2 feet below and 2 feet away from the proposed sidewalk going in along Denton Tap. To resolve a potentially hazardous situation, we came up with the attached design. We are proposing to convert the existing wye inlet into a junction box and construct another inlet further away from the sidewalk. This inlet will be within a proposed drainage easement and will collect the flows from the adjacent tract to the South. Please call me to discuss in further detail. Thank you, Bobby Kubin Design Associate Kimley-Hom and Associates, Inc. 801 Cherry Street, Unit 11 Suite 1025 Fort Worth, Texas 76102 (817) 335-6511 phone (817) 335-5070 fax bobb¥.kubinC, kimley-horn.com GRAPHIC SCALE GROUT CLOSED THROAI TO INLET From: To: Date: Subject: <Bobby. Kubin@kimley-horn.com> <kmarvin@ci.coppell.tx.us> 3/17/2005 1:39:21 PM Town Center Bank Drainage Issue Keith, Attached is the drainage revision for the Town Center Bank Project on Denton Tap per my voice mail. The existing wye inlet elevation is about 2 feet below and 2 feet away from the proposed sidewalk going in along Denton Tap. To resolve a potentially hazardous situation, we came up with the attached design. We are proposing to convert the existing wye inlet into a junction box and construct another inlet further away from the sidewalk. This inlet will be within a proposed drainage easement and will collect the flows from the adjacent tract to the South. Please call me to discuss in further detail. Thank you, Bobby Kubin Design Associate Kimley-Horn and Associates, Inc. 801 Cherry Street, Unit 11 Suite 1025 Fort Worth, Texas 76102 (817) 335-6511 phone (817) 335-5070 fax bobby, kubin@kimley-horn.com