Loading...
RC Townhomes-CS050315iJR ROSE DEVELOPMENT LLC Imagine... Believe Build March 15, 2005 Larry Davis Construction Inspector City of Coppell, Texas Coppell, TX 75019 (972) 304-3694 T. (972) 304-3570 F. Subject: "Riverchase Townhomes .4ddi'tion" Dear Mr. Davis: Her~ are copies of the lime tickets used for our projec% as well as testing reports from MACTEC Engineering and Consulting. I am also in possession of the "metal tags" that came on the trucks if you requir0. The calculations for lime were based on the foll,o~ing: - / ~ / ~/~ ~ / -29,000 SQ.FT. (Road Pavin +l~)oeyond back of curb) /9 (convert from SQ.FT. to SQ.YDS.) =3,222.22 SQ.'YDS. X30 LBS per YD. --96,666.67 LBS /2,000 LBS (covert from LBS. To TONS) =48.33 TONS The cumulative amount of lime ordered was 50.56 Tons (reference attached tickets). Horizontal and Vcrtieal L.-:-.~ bv ,,blucto in - and cutting the road to grade both prior to and after the lime layouts were ontam~.-, ~ ppg . stabili~tlun was performed. As you a~ aware this "liming" process is ext~nnely messy and we arc dealing with a eurvilinear street. ~ actions were performed and can be verified by Texas Site Specialties, [Yard MacAfee, (817) 269-7636 Cell and Peablcs and Associa~s, Don Peebles, (817) 223-7504 Cell. I perhaps caused some concerto as I myself was concerned about the Iow degree of slope on out road from ~ut to th~ first set of inlets duc to the 0.8% slope designed and fl~ought 1 could improve the chance of I believe that ali pm'ties involved on this project have performed in a highly professional and timely m~nner and have so.~oht to make this a quality devg~olanmm- i do apprecia~ yom beip in identifying and overseeing tbe work as it is out mutual desire to produce a "goud end producL' I would like to asaemble ali of the afo~ea~ationed parties on site to do a walk-through as we are anxious to begia ~ o~r I~ect as we have iacutred heavy delays due to weather. JR ROSE DEVELOPMENT LLC Imagine. Believe Build Thank you for your cooperation, and please let me know at your earliest convenience when you are available to meet. Jason Ro.~ TX.4rchit'ect #18541 (214) 454-7895 Cell JR/jr PC: Ron Lustig Project Manager ENC: Lime Truck Tickets x6, Mactec Engineering & Consulting Lime Tests JR ROSE DEVELOPMENT LLC · 410 SPINNAKER DR · ALLEN, TX · 75013 Tel. 214.454.7895 fa): 972.355.2362 TE MACTEC Engineering and Consulting 2200 Gravel Drive Fort Worth, Texas 76118-7123 Tel: 8'~7-284-7755® Fax: 817-589-1420 CLIENT: REPORT OF MOISTURE-DENSITY RELATIONS J.R. ROSE DEVELOPMENT; 410 SPI~TNAKER DR. : ALLEN, TX 75013 PROJECT: RIVERCEASE TOWNHOMES ADDITIONS COPPELL PAGE 1 OF I PROJECT NO,: 9023912 REPORT NO.: 501131 DATE OF SERVICE: 2/22/2005 AL/THOR~ZATION: REPORT DATE: 2/24/2005 SERVICES: Obtain sample of matierial used for construction, prepare samples and pe~f, orm moisture-~e~l, iCy relations test to establish the maximum density and optimum moisturel of the material. PROJECT DATA CONTRACTOR~ LrNDERGROUND UTILIFIil~S TEST DATE: 2/24/2005 DATE SAMPLED: 2/22/2005 MATERIAL: LIME TRT'D BRO~ CLAY SAMPLED BY: Randy Wentzler, CE~i. CLASSIFICATION: TEST FOR: LIMP TRT' D S~BGR~)E MATERIAL PREPARATION METHOD: Mois~ SAMPLE LOCATION: BETHEL S~HOOL R~D~STA 3+00 RAMMER TYPE: Mechanical METHOD OF TEST: ASTH D698, Method A ASTM D4318, Method A REPORT OF TESTS DENS. {pcf) 10 10 13 15 17 19 21 23 25 MOISTURE CONTENT MAXIMUM DENSITY, PCF: 109.0 OPTIMUM MOISTURE (%): 17 . 5 LIQUID LIMIT: 34 PLASTIC LIMIT: 27 PLASTICITY INDEX: 7 E -- Estimated Value Technician: Morgan Fine, Jr., C~T. Field Services Mgr. Report Distribution: 1) J.R ROSE DEV;LOPMENT I1) CITY OF COPPELL ENG NI~ER NG QP Il) MARGARET GOFF;IrOWNHOMES ALLEN