WA0001-CS000125Tuesday, January 25, 2000 2:42 PM
Page: I of 2
TRANSMITTAL OF ADDENDUM
INSTRUCTIONS:
Acknowledge receipt of Addenda in Proposal, on outer envelope 3f bid AND WITH THE
FORM BELOW FAXED TO (214)361-0204 upon receipt.
Addendttm Acknowledgment FAX to (214)361-0204
I Acknowledge the receipt of Addendum No. 2
City of:
Project Name:
Coppell
Repaint of 1.5 Million Gallon Tank Elevated Storage
Tank Interior
By Facsimile Transmission on this date:
January 25, 2000
Contractor's Signature
Company Name
E-MailAddress:
"PLEASE SIGN & FAX THIS PAGE ~BACK TO SJ&F"
(as verification that you received this Fax)
(214) 361-0204
Total Number of Fax Pages:
- 1 - AddendumNo. 1
Tuesday, Jenua~ 25, 2000 2:42 PM To:
2143610204
From: Barbers Lowe, 214-36%0204 Page: 2 of 2
CITY OF COPPELL, TEXAS
REPAINTING OF THE 1.5 1VIILLION GALLON
ELEVATED STORAGE TANK INTERIOR
ADDENDUM NO. 2
January 25, 2000
Hans and specifications for the Repainting of the 1.5 Million Gallon Elevated Storage Tank Interior project, for
the City of Coppell, Texas, on which bids are to be received until 2:00 p.m., January 28, 2000, are hereby
modified as follows
Refer to Section SC.30.G. Annlieation of the Special Conditions. In the fourth paragraph of this section,
r~wise the electric service to be provided by the City of Coppell to "240 volt, 3 phase, 200 amp service".
Delete all references to 480 volt, 255 amp senice in this paragraph.
Bidders shall acknowledge receipt of Addendure No. 1 in the space provided in the Proposal, on the outer
envelope of their bid, and by faximt back the "Transmittal of Addendure Acknowlediment Sheet"
to Shimek. Jacobs & Finklea. L.L.P. at (214)361-0:204.
SHIMEK, JACOBS & FINKLEA, L.L.P.
CONSULTING ENGINEERS
DALLAS, TEXAS