Wynnpage N 2&3-CS050303DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
Wvnnpage plaza North~ Lot 2~ Block Bt Site Plan, to allow thc
development of an approximate 3,500-square-foot one-story office building
and an approximate 16,000-square-foot two-story building on 2.234 acres of
property located along the west side of Denton Tap Road, approximately
180 feet north of Wynnpage Drive, at the request of Greg Yancey.
STAFF REP.: Matt Steer PROJECT ID# SPA-05-0005
ORC DATE: FEBRUARY 23, 2005 and MARCH 3, 2005
CONTACT: Kenneth M. Griffin, I.E., Dir. o( En~ineerin~Public Works 972/304-3686
Site Plan:
Sheet C2:
1. Does the agreement with the property owner to the north allow concentration of flow
as proposed from the flume?
Sheet C3:
1. Show location of FDC and minimum 4" diameter piping. FDC shall be on same side
of fire lane as the F.H.
· Additional requirements may be identified during full engineering plan review.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
WynnpaRe Plaza North~ Lot 2~ Block Bt Final Plat~ to allow the
development of an approximate 3,500-square-foot one-story office building
and an approximate 16,000-square-foot two-story building on 2.234 acres of
property located along the west side of Denton Tap Road, approximately
180 feet north of Wyrmpage Drive, at thc request of Greg Yancey.
STAFF REP.: Matt Steer PROJECT ID# FP-05-0006
DRCDATE: FEBRUARY 23, 2005 and MARCH 3, 2005
CONTACT: Kenneth M. Gri~n, P.E., Dir. o( En~ineerin~/Public Works 972/304-3686
1. Please verify with the gas company that the modified alignment of the crossing of their
easement is acceptable. Verify parking in their easement is acceptable.