Loading...
Wynnpage N 2&3-CS050303DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Wvnnpage plaza North~ Lot 2~ Block Bt Site Plan, to allow thc development of an approximate 3,500-square-foot one-story office building and an approximate 16,000-square-foot two-story building on 2.234 acres of property located along the west side of Denton Tap Road, approximately 180 feet north of Wynnpage Drive, at the request of Greg Yancey. STAFF REP.: Matt Steer PROJECT ID# SPA-05-0005 ORC DATE: FEBRUARY 23, 2005 and MARCH 3, 2005 CONTACT: Kenneth M. Griffin, I.E., Dir. o( En~ineerin~Public Works 972/304-3686 Site Plan: Sheet C2: 1. Does the agreement with the property owner to the north allow concentration of flow as proposed from the flume? Sheet C3: 1. Show location of FDC and minimum 4" diameter piping. FDC shall be on same side of fire lane as the F.H. · Additional requirements may be identified during full engineering plan review. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: WynnpaRe Plaza North~ Lot 2~ Block Bt Final Plat~ to allow the development of an approximate 3,500-square-foot one-story office building and an approximate 16,000-square-foot two-story building on 2.234 acres of property located along the west side of Denton Tap Road, approximately 180 feet north of Wyrmpage Drive, at thc request of Greg Yancey. STAFF REP.: Matt Steer PROJECT ID# FP-05-0006 DRCDATE: FEBRUARY 23, 2005 and MARCH 3, 2005 CONTACT: Kenneth M. Gri~n, P.E., Dir. o( En~ineerin~/Public Works 972/304-3686 1. Please verify with the gas company that the modified alignment of the crossing of their easement is acceptable. Verify parking in their easement is acceptable.