Loading...
Park West CC(02-2)-CS050303DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS 'TEM: Park West Commerce Center~ Lot 2R-3,Block 2, Site Plan, to allow the development of two office warehouse buildings (137,000-square-feet and 153,000-square-feet, respectively,) on 16.8 acres of property located at the northwest comer of Beltline and Airline Roads, at the request of Kyle McCullah, Hardy McCullah/MLM Architects, Inc. STAFF REP.: Gary Sieb PROJECT ID# SPA-05-0009 DRC DA TE: FEBRUARY 23, 2005 and MARCH 3, 2005 CONTACT: Kenneth M. 972/304-3686 COMMENT STATUS: ~ FINAL Sheet Cl.0: 1. Provide verification from the adjacent property owner to the west that allows this development to connect to the adjacent property's fire line. This could impact the entire water line and fire protection for the entire site. 2. The City anticipates beginning construction of a new 16" water line adjacent to this site in mid 2005. There will need to be coordination between this development and the City pertaining to taps, location and timing. · Additional requirements may be identified during full engineering plan review. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ~TEM: Park West Commerce Center~ Lot 2R-3~ Block 2~ Replat, being a replat of Park West Commerce Center, Lot 2R-2, Block 2, to allow the development of two office warehouse buildings (137,00-square-feet and 153,000-square- feet, respectively,) on 16.8 acres of property located at the northwest comer of Beltline and Airline Roads, at the request of Ryan Safford of Pacheco Koch Consulting Engineers. STAFF REP.: Gary Sieb PROJECT ID# RP-05-0010 DRCDATE: FEBRUARY 23, 2005 and MARCH 3, 2005 CONT,4 CT: Kenneth M. Griffin, P.E., Dir. o[ En~ine, COMMENT ST.4 TUS: l~Rfa~J~ll~tNdd~ rin~aUblic Works 972/304-3686 ,/ FIN.4L P.E!qSED 1. Provide a "mutual access easement", not a "Proposed" MAE. 2. Only 10 foot of the 20 foot Utility and Drainage Easement dedicated by Volume 90218, page 3264 can be abandoned. There still must be a minimum 30 foot Utility and Drainage Easement centered over the existing 72" RCP. The 30 foot easement is shown on Sheet A-1.0 and should be shown on the plat. 3. Is easement for fire hydrant lead on north side of property? Also, fire hydrant is too dose to building.