Park West CC(02-2)-CS050303DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
'TEM:
Park West Commerce Center~ Lot 2R-3,Block 2, Site Plan, to allow the
development of two office warehouse buildings (137,000-square-feet and
153,000-square-feet, respectively,) on 16.8 acres of property located at the
northwest comer of Beltline and Airline Roads, at the request of Kyle
McCullah, Hardy McCullah/MLM Architects, Inc.
STAFF REP.: Gary Sieb PROJECT ID# SPA-05-0009
DRC DA TE: FEBRUARY 23, 2005 and MARCH 3, 2005
CONTACT: Kenneth M.
972/304-3686
COMMENT STATUS:
~ FINAL
Sheet Cl.0:
1. Provide verification from the adjacent property owner to the west that allows this
development to connect to the adjacent property's fire line. This could impact the
entire water line and fire protection for the entire site.
2. The City anticipates beginning construction of a new 16" water line adjacent to this
site in mid 2005. There will need to be coordination between this development and the
City pertaining to taps, location and timing.
· Additional requirements may be identified during full engineering plan review.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
~TEM:
Park West Commerce Center~ Lot 2R-3~ Block 2~ Replat, being a replat of
Park West Commerce Center, Lot 2R-2, Block 2, to allow the development
of two office warehouse buildings (137,00-square-feet and 153,000-square-
feet, respectively,) on 16.8 acres of property located at the northwest comer
of Beltline and Airline Roads, at the request of Ryan Safford of Pacheco
Koch Consulting Engineers.
STAFF REP.: Gary Sieb PROJECT ID# RP-05-0010
DRCDATE: FEBRUARY 23, 2005 and MARCH 3, 2005
CONT,4 CT: Kenneth M. Griffin, P.E., Dir. o[ En~ine,
COMMENT ST.4 TUS: l~Rfa~J~ll~tNdd~
rin~aUblic Works 972/304-3686
,/ FIN.4L P.E!qSED
1. Provide a "mutual access easement", not a "Proposed" MAE.
2. Only 10 foot of the 20 foot Utility and Drainage Easement dedicated by Volume 90218,
page 3264 can be abandoned. There still must be a minimum 30 foot Utility and
Drainage Easement centered over the existing 72" RCP. The 30 foot easement is
shown on Sheet A-1.0 and should be shown on the plat.
3. Is easement for fire hydrant lead on north side of property? Also, fire hydrant is too
dose to building.