Loading...
RC Townhomes-LR050318 (2)P.O. Box 118095 Carrollton, TX 75011-8095 PROFESSIONAL INLINE SERVICES, INC, Office 972-939-2600 Fax 214-731-0535 Mobile 214-534-9942 Beeper 214~249-2309 LOW PRESSURE AIR TEST FOR GRAVITY SANrrARY sEWE. R Test Procedure: Each section of sewer shall be tested between sucessive manholes. Air shall be introduced into the pipeline until 4.0 psi gauge pressure has been reached. Al Ihat lime the flow of air shall be reduced and the internal air pressure shall be maintained Oe~ween 3.5 and 4.5 psi gauge for at least two(2) minutes to allow the air temperature to come to equilibrium with the temperature of the pipe wall.s. Pressure in the pipe shall be constantly monilored by a gauge and hose arrangement separate from the hose used to introduce air into the hne Pressure in Ihe pipe shall not be allowed to exceed 5 psi. Aher the temperature has stabilized and no air leeks at the plugs have been found, the air pressure shall be used Id determine Ihe time lapse required for the air pressure to drop to 2.5 psi gauge. If the time lapse required for the air pressure to decrease from 3.5 to 2.5 psi exceeds that shown in the following lable. Ihe pipe shall be presumed to be within acceptable limits i'or leakage. if Ine lime lapsed is less than that shown in the table, the contractor shall make corrections to reduce the leakage Io acceptable limits. Line Information t I I tTestResu~ts lAir. Test IMandre' Line Stalion to Station Pipe Size L.F.Tested Time Passed? Passed? /q- ot,~ C- 2t4o ~'39'' ,2_3g"? 7 ~ ~' ~ Owner ~j~/) Project /~./~f/~/,~.s-[ ~!,/~1 ~n~ ~ ~/'~ Location ~ ~ ~ested By ~ ~/ Full Name ~_~ Inspectofs Job# Professional Inline Services, Inc. P.O. Box 118095 Carrollton, TX 75011-8095 Office 972-939-2600 Fax 214-731-0535 CONTRACTORS NAME: (~ u a c~ 4 ct ('~ Crv r3 ~ PROJECT: CITY OF: INSPECTOR: INSPECTION FIRM: Professional Inline Services, Inc. OPERATOR: