Coppell Trade-LR050324REPORT OF DAILY FIELD ACTIVITIES
Report Number: 94051081.0012
Service Date: March 11,2005
'lrerracon
8901 Carpenter Frwy. Ste #100
Dallas. Texas 75247
(214) 630 1010
Client: Coppell Trade Center LP
Attn: Al Sorrels
5055 Keller Springs Rd Ste 300
Addison TX 75001
Report Date: March 24. 2005
Project: Coppell Trade Center ........
NWC Sandy Lake & State St
Coppell. TX
Project Number: 94051081
Services: Daily field activities.
On this date. HBC/Terracon's technician arrived at the above referenced job site as scheduled for
observation of daily field activities. The following was observed and/or tested.
HBC/Terracon's technician arrived at the job site to observe the earthwork operation.
The areas near the existing creek were saturated and soft. The contractor attempted
to excavate four (4) areas to determine the boundaries of the wet areas. After review
of these soils. HBC/Terracon recommends visual observation by one of our staff
engineers for recommendation of these soils.
Technician: Michael E. Odom .~ ~
q '~ I ~er~anAss~ochl(1
;,, c~,eil ,n! Reviewed by: _
(1) C~ty of Coppel~ TX Robert D Ray..S E T ~
Tale tests were performed in general accordance with applicable ASTM. AASHTO. or DOT test methods This repo,t is exck, siSv%;¢;oT;l(~;c~s;;%cher,t
indicated above and shall not be reproduced except in full without the written consent of our company Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials
Page 1 of 1