Loading...
Coppell Trade-CS050405COppELL April 5, 2005 Al Sorrels Coppell Trade Center, L/P. 5055 Keller Springs Road,//300 Addison, TX 75001 RE: Coppell Trade Center, Lot 1 Block 1 Post-it' Fax Note 7671 4/,//~"/~.~ Co/Dept ~o Phone. Phone Dear Mr. Sorrels: During a site visit conducted today I observed that some of the conditions discussed in the pre- construction meeting held on March 24~ are not being adhered to or have not been accomplished as promised. Those conditions are as follows: 1. I found no posting of the SWPPP for the project. This item was discussed at the meeting and should have been posted immediately upon the commencement of work. 2. The erosion control I observed does not match the approved plan of erosion control placement submitted for the project. We respectfully request that you immediately cease all work activity until such time as you bring the project into compliance per Ordinance No. 91514 which was provided to you at the pro-construction meeting. Once you have completed the listed items, please contact me to schedule a field visit. SincerelY, C~n~tru6tion InSpector Co/Dept Co CC: Ken Griffin, P.E., Dir. of Engineering & Public Works Keith Marvin, P.E., Civil Engineer Dayton Macatee, Macatee Engineering Jeff Hall, Metro-Plex Underground LP Paul Bosco, Metro-Plex Underground LP Rick Stull, McFadden & Miller ¢OPPEL/, ~955.200~ 255 PAg~KWA¥ ,~- g~ 0 bO× ~78 ~r COF~ELL TX 75019 * TEL 972/462 0022 ~k FAX 972/3'04 3673