Loading...
DR0401-EM050405Opinion of Probable Construction Cost Oak Crest Drainage Improvements ~ Item No. Quanti~ Unit Description Unit Price Total Price 1 1 LS Mobilization & Demobilization $5,000.00 $5,000.00 2 220 SY Remove & Dispose of Concrete Flatwork $8.00 $1,760.00 3 105 SY Remove & Dispose of Asphalt Pavement $10.00 $1,050.00 4 9 EA Remove & Dispose of Existing Culvert $150.00 $1,350.00 5 1738 LF Excavate Ditch Line to Grade $5.00 $8,690.00 6 1 EA Remove & Replace 3" Crape Myrtle $750.00 $750.00 7 3 EA Remove & Re-set Mailbox (Brick) $750.00 $2,250.00 8 3 EA Remove & Re-set Mailbox (Other Than Brick) $50.00 $150.00 9 1 EA Adjust Water Valve Box $200.00 $200~00 10 142 LF Furnish & Install 12" RCP Culvert $45.00 $6,390.00 11 215 SY Construct 6" Concrete Driveway $30.00 $6,450.00 12 1 LS Construct 6" Concrete Valley Gutter $6,500.00 $6,500.00 13 5 SY Construct 4" Concrete Sidewalk $25.00 $125.00 14 1576 LF Furnish & Install Block Sod $2.50 $3,940.00 15 1 LS Furnish, Install, Maintain & Remove Traffic Control Devices $500.00 $500.00 16 1 LS Furnish, Install, Maintain & Remove Erosion Control Devices $3,000.00 $3,000.00 !Sub-Total $48,105.00 Contingencies (10%) $4,810.50 Grand Total $52,915.50 4/5/20052:11 PM 1 of 1 Project # SS 02-01