WA9701-CS050303BII (HOFF HENDRICK$ & CONWA¥, L.L.P.
CONSULTING ENGINEERS
7502 Greenville Ave., #220
JOHN W. BIRKHOFF, P.E.
RONALD V. CONWAY, P.E.
GARY C. I-~NDRICKS, P.E.
JOE R. CARTER, P.E.
PAUL A. CARL[NE, P.E.
MATT HICKEY, P.E.
DOUGLAS K. SHOWERS, P.E.
Dallas, Texas 75231
Fax (214) 361-0204
March 3, 2005
Phone (214) 361-7900
[/~. Kenneth Griffin, P.E.
City Engineer / Director of Public Works
City of Coppell
255 Parkway Blvd.
Post Office Box 478
Coppell, Texas 75019
Re: Denton Tap Road 16-inch Water Line (Airline Drive to Bethel Road)
Final Preliminary Plans
Dear Mr. Griffin:
We are enclosing three (3) sets each of the final preliminary construction plans for the re-aligned Denton Tap
Road 16-inch Water Line (Airline Drive to Bethel Road). This is for your final review and comment.
Please notify us when your review comments are completed so that we can meet and address any outstanding
issues. We are ready to complete specifications and final plans once we have received your comments.
Included with this transmittal is a revtsed Engineer s Op~mo of Construction Cost. We trust that this will
assist the City in it's planning for the bidding and construction phases of this project.
If we can be of further assistance, please do not hesitate to contact us.
Sincerely yo:/~s,//
Enclosures
cc: Ms. Suzan C. Taylor, C.I.P. Coordinator