Coppell Trade-CS050406COPPELL Telephone Record TO: FROM: DATE: REF: File Charlene La Mattina (_~? April 6, 2005 Coppell Trade Center Background: City of Coppell inspector Larry Davis was on-site yesterday at the above referenced project when the exposure and survey (by the utility contractor) of two existing manholes revealed that the actual flow line elevations differed from the approved engineering plans. The contractor sought to continue work to lay pipe between the manholes, however Mr. Davis required that notification to and review by the Engineering Department take place. A submittal was received in the Engineering Department this morning from Macatee Engineering proposing to revise the grade line of the approximately 1700 LF of sanitary sewer to 0.35% between the manholes. Per telephone conversation at approximately 2:00 p.m. with the Engineer of Record for the project, Dayton Macatee, Macatee Engineers, the utility contractor provided the revised elevations at the existing manholes. The proposed revisions are based on the information provided to Mr. Macatee by the utility contractor with no verification of the information by Macatee Engineers. When informed that Mr. Davis was not comfortable with the information provided by the utility contractor, Mr. Macatee stated that he was absolutely comfortable with survey information provided to him. 1g$$.200S