Hidden Valley-LR050216ConstTucti~n Ma*¢r,:als Te:*ting
and Environmental Consul~fing
Texas
CM%
II'lC
P.Oi
t0044 Monroe Drive Dallas, Texas 75229 (2141 352-6957
Fax (21.4) 35?-6972 www .rexasemt.¢om
GENERAL REPORT
SIEVE ANALYSIS
Report Date: February 16, 2005
Test Date: Febma_,-y 14. 2005
C!i¢nt:
Street Real Estate
General Report No.: ]
Hidden Valle.,.' Estates
ProSect 'qo; 204-0t. 64
Ident:ficat,on: Sieve Analysis of Road Mixed Material (lime treated)
Method of'rest: TEX- [ 01 -E
Page l ot'l
Results
Location
Actual Percent Passing
Specifications
SDHPT Item 260- 1972
Minimum Percent PassinR.
13/~'' ~ieve ~4 ~leve
Hidden Valle5,' Dr
Centedine - Station
2. Hidden Valley Dr.
Centerline - Station
Hidden Valley Dr.
SW area - Cul-de-Sac
4 Hidden Valley Dr,
s'S. oF
Sta;~ou 10+~53-
100% 51.7%* 100 60
i00% 57.7% * 100 60
100% 52 0%* 100 60
!00% 42 0%' 100 60
'Does not meet requirements Subgrade still ~oo wet from February. 12. 2005 rains. Contractor scheduled
rctesting 2 pm.
rechmcian: RG
~onstruc~ion M~teriais Testing
and Fnvironmenml Cotuultmg
Texas
CMT,
Irlc,
10044 Monroe Drive Dallas, Texas 75229 (Z14) 352-6957
Fax (214) 352-6972 www ,texascmt,cora
GENERAL REPORT SIEVE ANALYSIS
Report Date: February 16, 2005
Test Date: February 14, 2005
Client: Street Real Estate
General Report No.: 2
Project: Hidden Valley Estates
Project No: 204-0 t 64
' Identification: Sieve Analysis of Road Mixed Material (lime treated)
'vl<thod or'Test: TEX- l 01 -E
Page 1 of 1
Location
Actual Percent Passing
[% Sieve ~4 Sieve
Specifications
SDHPT Item 260 - 1972
Minimum Percent Passing:
I Hidden Valley Dr. 100% 65.9% 100 60
Center line - ~tation 14+00
2. Hidden Valle)' Dr, 100% 51.0% * ! 00 60
SW area. Cul-de-Sac
3. Hidden Valley Dr. !00°4, 60.1% 100 60
5' S. of center line
Station 10--50
4. Hidden Va ley Dr 100% 64.0%
5' W. of center line
Station 8+00
100 60
5. Hidden VaWey Dr.
S' N. or'center line
Station 5~00
100% 65,9% :00 60
6, Hi~d~den Valley Dr. 100% 66.2% 100 60
C~nter line - Station 2 -20
7. Hidden Valley Dr.. [00% 67,4% [00 60
SW area - Cul-de-Sac - Retest
"Does not meet requirements. Ai%r aclditionat pulverization, subgrade retested and tbund to meet requiremenB
~ see
Technician: RG
TOTAL P. 02