Loading...
MA0405-CS050408.April 8, 2005 COPPELL North Texas Bomanite 11107 M[orrison Lane Dallas, TX 75229 Fax 972.,'484-8466 Bdck Paver Replacement Program Project # MA 04/05 Bid #Q-0405-02 Dear Sir: The City' of Coppell will be accepting bids on the referenced project prior to April 26, 2005, at 2:00 pm., at which time they wilI be publicly opened and read. The Scope of Work is generally as follows: This work shall consist of crosswalk improvements m various intersections located along MacArthur Boulevard. The project can be bid as Stamped Concrete Pavement (Alternate 'A') or as Stamped Asphah Pavement (Alternate 'B'). The City reserves the right to a',vard project as either stamped concrete or stamped asphalt, regardless of price. Alternate 'A' shall consist of the removal of the existing brick pavers and underlydng concrete pavement and the installation of 8" concrete pavement and 8" stamped concrete pavement. The work includes, but is not limited to, the installation of base material, and traffic control. Ahemate 'B' shall consist of the removal of the existing brick pavers and under134ng concrete pax ement and the installation orS" concrete pavement and 2" stamped asphah pavement The work includes, but is not limited to, the installation of 4" of HMAC Type "B" binder course, base material, and traffic control For additional information, please feel fi'ee to contact Jerod Anderson, Purchasing Atent at (972) 304-3698. ~ Sincerely, m nneth M Giif'fin, P.E. Director of Engineering & Public Works cc: Jerod Anderson, Purchasing Agent cOPPEL~ 7955.200.~ .......................... 255 PAF~KWAy * PO BOX 9478 ~ COPPYLL TX 75019 ~- TEl_ 972/462 (3022 * ~-AX 972/304 3073 April 8, 2005 Pavement Services Colporation 4000 Tarrant Main PO. Box 1107 Euless, TX 76039-1I 07 Fax 817/540-0740 RE: Brick Paver Replacement Program Project # MA 04/05 Bid #Q-0405-02 Dear Sir: The City ofCoppell w'ill be accepting bids on the referenced project prior to ,April 26, 2005, at 2:00 pm., at which time they will be publicly opened and read. The Scope of Work is generally as folloxx s: This work shall consist of crosswalk improvements in various intersections located along MacArlhur Boulevard. The project can be bid as Stamped Concrete Pavement (Alternate 'A') or as Stamped Asphah Pavement (Alternate 'B'). The City reselx, es the right to award the proj ecl as either stamped concrete or stamped asphalt, regardless of price. ,Alternate 'A' shall consist of the removal of the existing brick pavers and underlying concrete pavement and the installation of 8" concrete pavement and 8" stamped concrete pavement. The work includes, but is not limited lo, the installation of base material, and traffic control. Alternate 'B' shall consist of the removal of the existing brick pavers and underlying concrete pavement and the installation of 8" concrete pavement and 2" stamped asphalt paxement. The work includes, but is not limited to, the installation of 4" of HMAC T3pe "B" binder course, base material, mqd traffic control For additional information, please feel free to contact Jerod Anderson, Purchasing Agent at (972) 304-3698 Sincerely, Kem~eth M. Griffin, P.E. Director of Engineering & Public \Vorks cc: Jerod Anderson, Purchasing Agent cOPPEL& Ig$5.2005 April8,2005 COl'FELL Hardscape Construction Specialties P.O. Box 821812 North Richland Hills, Texas 76182 Fax 817/379-3009 Brick Paver ReptacementProgram Pr~ect#MA 04/05 Bid #Q-0405-02 Dear Sir: The City of Coppell will be accepting bids on the referenced project prior to April 26, 2005, at 2:00 p.m., at which time they will be publicly opened and read. The Scope of Work is generally as follows: This work shall consist of crosswalk improvements in various intersections located along MacArthur Boulevard. The project can be bid as Stamped Concrete Pavement (Alternate 'A') or as Stamped Asphalt Pavement (Altemate 'B'). The City reserves the right to award the project as either stamped concrete or stamped asphalt, regardless of price. Alternate 'A' shall consist of the removal of the existing brick pavers and underlying concrete pavement and the installation of 8" concrete pavement and 8" stamped concrete pavement. The work includes, but is not limited to, the installation of base material, and traffic control. Alternate 'B' shall consist of the removal of the existing brick pavers and underlying concrete pavement and the installation of 8" concrete pavement and 2" stamped asphalt pavement. The work includes, but is not limited to, the installation of 4" of HMAC Type "B" binder course, base material, and traffic control. For additional information, please feel free to contact Jerod Anderson, Purchasing Agent at (972) 304-3698. Sinc~ly, ff,~ Kenn~t~M. Griffin, P.E. Director of Engineering & Public Works cc: Jerod Anderson, Purchasing Agent c. OPPEL/. 1955o200S 255 PARK'C/Ay ,k pO aOX ~47B * COPPEL L TX 75019 ~- TEL 972/462 0022 ~- FAX 972/304 3673 North Texas Bomanite 11107 Morrison Lane Dallas, Texas 75229 Fax 972/484-8466 Pavement Services Corporation 4000 Tarrant Main P.O. Box 1107 Euless, Texas 76039-1107 Fax 817/540-0740 Hardscape Construction Specialties P.O. Box 821812 North Richland Hills, Texas 76182 Fax 817/379-3009