Loading...
ST9302-CS 980313 (2) 0 Kimley-Horn and Associates, Inc. Transmittal 910 Col~ Strum Fort Wo~, Texas 70102-3~ TEL 8!7 3,35 ~511 MET 8!17 ~54 42~8 FAX 8 7 335 5070 -.~X 478 We are sending you ~ Attached [] Under separate cover via [] Shop drawings [] Pdn~ [] Samples •Changeorder Copies Date No. Description These are transmitted as checked below: /~or your use [] Approved as submitted [] As requested [] Approved as noted [] For review and ~omment [] Flelumed for corroclio~ [] Submit __ copies for distribu~ [] Return corrected I~ints Remarks Copy to ~ !LU ~ ]SDYC:)).~t~ J~'IT~) Signed I CITY OF COPPELL Sandy Lake Road Meeting Notes March 11, 1998 2:00 P.M. The following people were in attendance: Ken Griffin Mike Martin Curt Snow Phillip Boyd Jun Battad Hamid Baha Lee Allison Seni Tatum City of Coppell City of Coppell City of Coppell City of Dallas City of Dallas City of Dallas Kimley-Horn Kimley-Horn The meeting gommenced with Jun Battad distributing a handout detailing paving, drabS, and street light foundation conflicts with the existing Dallas Water Utilities 30" Water Mai~. Initial comments from Coppell were of concern since DWU had a totall of 26 Relocations/Lowerings. Ken Griffin and Phil Boyd both discussed the tremendous head losses that would occur at each relocation/lowering due to the substantial number of bends.~, Another major concern was the required total shut down period. Phil and Jun both stated ~hat they believed several of these conflicts could be resolved when each conflict is discussed. Paving conflicts were not discussed in detail since the conflicts were based on a total cover of 3'- 6", and relocations/lowerings can not be avoided in these cases. The total number Of paving conflicts is 6. A detailed discussion began with addressing each street light conflict. A brief summary of the discussion and resolution at each station follows: General Comments: Coppell's standard spacing for street lights is 180' - 200'. The street lights ~Pically consist of a 14" bolt pattern with a 22" shaft and are typically between 6-8' de~. DWU agreed to change their conflict clearance criteria. Instead of 2' minimum ~learance from the street light foundation, they will allow a 1' minimum clearance, if needed. Add notes to plans: Contractor shall field locate DWU water main when the main is valved off (not necessarily dewatered). When street light foundation has less than the typical 2' clearance, add Caution Notes to the plans. Mee~ Notes, Mntv. h 12, j~98, Page 2 When the DWU water main is to be lowered, fully welded joints are a possibility instead of concrete blocking if there are potential conflicts with other utilities. Flower Mound is planning on shutting down one of their take points this fall. The Contractor should be aware of this and coordinate field locating the DWU water main with !this shut down whenever possible. Street Light Foundations: 1) Sta. 7+ 22 - Coppell will eliminate this street light and move the light at Stai 8 +75 to 8+25. ~ 2) Sta 14+92 - Should be able to adjust location in field depending on locationi of DWU main. ~ 3) 4) 5) 6) Sm 16+43 - There was no other location possible for the street light. relocate their water main. Sm 24+89 - Location should be within revised 1' clearance criteria. Sm 27+94 - Location should be within revised 1' clearance criteria. Sm 36 + 72 - Location should be within 2' clearance criteria. £~WU will 7) Sta 38+20 - Location should be within 2' clearance criteria. 8) Sta 39 + 76 - Location should be within 2' clearance criteria. 9) Sta 42+75 - There was no other.location possible for the street light. I~ relocate their water main. Contractor shall field locate the water main to C necessary relocation. / gU will )nfirm a 10) Sm 49+ 18 - There was no other location possible for the street light. DWu will relocate their water main. Contractor shall field locate the water main to Confirm a necessary relocation. 11) Sm 52+58 - Coppell will adjust spacing to eliminate one light. (Light at 54+25 will be moved west and light at 52+58 will be eliminated.) 12) Sta 56 + 11 - Coppell will move light to 55 + 98. 13) Sta 57+65 - Coppell will move light to 58 + 10. 14) S,ta 60+80 - Contractor will field verify location to determine whether there ~s at least 1 of clearance. Coppell will mark Sta 62+60 as an alternate location for th~ light. / 15) Sta 64+20 - Coppell will adjust location slightly to accommodate 2' clearance. I I' lilll M~ting Not~, Match 12, ~995, 1~ 3 16) Sta 67 +60 - Coppell will mark Sta 66+ 150 as an alternate location if 1'-2' of ~learance can't be met. Otherwise, lights will bo shift~l west from 69+00 to 715+00.. 17) Sta 94+64 - Coppell will mov, light west approximately 60', and also the light at Sm 100+80 will move 25' east. Additional) Sta 101 +25 - Coppoll will shift line west to shorten the length of ielocation already necessary due to conflict with drainage lateral at Sta 101 + 17. DWU conflicts with three drainage laterals were also discussed as follows: 1) Sta 18+03 (Lateral 10) - Coppell will try to adjust the lateral. Coppell will lateral into junction box or possibly lower the lateral and tie into an adjacenl 2) Sta 46+ 19 (Lateral 35) - Coppell will try to flatten the grade on the lateral direct conflict. It was also suggested that the DWU main and the drainage cradled and capped to avoid large point loads. 3) Sta 55+40 (Lateral 48) - Major conflict. DWU will lower water main. 4) Sta 101 + 17 (Lateral 76) - Again major conflict. DWU will lower, but ( moving street light to accommodate a shorter relocation. OTHER GENERAL COMME~ KHA and DWU will be in contact with each other to finalize exact locations. It was to take 6-10 ~ to finish, KHA/Coppell is to keep in mind that Coppell plans to advertise for bi~ by the first of May, and award bids at the June 23, Council Meeting. Discussion about the approval of the inter-local agreement concluded that DWU anficip~ able to approve and give the money up front. Minutes by Seni Tatum. either tie lateral. o avoid a lateral be ',oppell is 998 City