Loading...
Vista Ridge 1R-8 D-CS050411 (2) T H E~ C I T Y - 0 F CO?FELL April 11, 2005 Scott D. Caruthers, P.E. Dowdey, Anderson & Associates, Inc. 5225 Village Creek Drive, Suite 200 Plano, TX 75093 RE: Vista Ridge (The Plaza)/Lot 1R-8, Block D Construction Plan Review Comments Dear Mr. Caruthers: The City of Coppell has reviewed the referenced plans and has the following comments to offer: Re-Plat (Coppell) 1. Add the 25' x 25' UE and the 12' x 55' WME at the south side of the property to the line table. 2. Provide a copy of the proposed Master Owners Association agreement regarding shared utilities and maintenance responsibilities. 3. Verify that the 24' FAUE is not obstructed by the construction of the deceleration lane along Highland Drive. 4. The 15' UE & DE should also be a sidewalk easement since there is no space in the ROW for sidewalks. 5. The site plan shows a driveway toward the west along the lot line of lots 5 and 6. Is this intended to be a mutual access to the adjacent property in the future? Should there be a mutual access easement provided at this location? 6. The second page of the plat should be called "2 of 2' instead of"l ofT'. Site Plan 7. Update the site plan to reflect any changes to plan including the 20' DE and the deceleration lane along Highland Drive. Plate 4: Plaza Boulevard Paving Plan & Profile 8. Typical Pavement Section: A 7" thick, 3000 psi concrete is the minimum standard for this street. The revised section that has been submitted, a 6" thick, 4000 psi concrete will be acceptable. However, please note that any hand pours or irregular sections will require an additional sack of cement per cubic yard. c. OPPELg 255 PARK WAY ~ P 0 BOX 478 ~ COPPELL TX 75019 ~ TEL 972/462 0022 ~ FAX ~72/304 3673 2 9. Section A-A: Provide profiles of the temporary bar ditch along Plaza Boulevard. 10. The deceleration lane along Highland Drive as proposed obstructs the fire lane. Modify the detail so that there are no obstructions. Modify the plat and site plan accordingly. 11. Show ADA Ramps to be constructed at the intersections of Plaza Boulevard with Hwy. 121 and Plaza Boulevard with Highland Drive. Provide comer clips on the plat as necessary. 12. Provide a band of stamped concrete at the intersection of H~vy. 121 and Plaza Boulevard per the City of Coppell Subdivision Ordinance. 13. Provide a detail of the 25' pavement section. Plate 7: Drainage Area Map 14. The Total Gutter Flow calculations appear to be incorrect for inlets Al, A2, B1 and B2. Please revise. 15. There are 2 curb inlets proposed for lines A and B. Is the use of one curb inlet adequate for line C? 16. Provide more detailed grading information for DA's 9 and 13. Plate 7A: Fully Developed Drainage Area Map 17. Show private drains for the fully developed condition. Are they proposed to cross lot lines? Provide private drainage easements as necessary. Include the private systems, including drop inlets, in the inlet design chart. 18. Provide more detailed grading information. Plate 9: Water & Sanitary Sewer Plan 19. Would it be beneficial to install a tee and plug at the locations where the private fire line will be installed rather than tapping the line at each of these locations later? 20. Will 4" sanitary sewer services be adequate to service the 2-story buildings proposed on lots 5 and 6? 21. The location of the future private fire line will need to be moved out of the public utility easement. 22. Refer to the mark-ups on the sheet: what is the line that that extends out of the future fire line to the west property line? Is it a stub-out? 23. Water and Sewer General Note 5: Backfill shall be compacted to 95% standard proctor density ~ 0 to +4% of optimum moisture content. 24. Water and Sewer General Note 9:12 gauge single strand copper wire shall be used (instead of Terra Tape) as per the City of Coppell Subdivision Ordinance. 25. Show appropriate easements on this sheet. Plate 9A: Line "A" Sanitary Sewer Profile 26. Include future water crossings on this sheet. Determine if spacing will be adequate to meet TCEQ requirements. Show concrete encasement or other measures determined to be necessary. The City of Lewisville shall approve any work performed in the City of Lewisville. TXDOT shall approve any work performed in the TXDOT ROW. Provide documentation 3 of permission and approval from these entities to the City of Coppell for work relating to this project. Please make the necessary changes and submit these marked-up plans and two sets of revised plans to the City for review. If you have any questions or would like to meet to discuss the comments, please contact this office at your convenience. Sincerely, Charlene La Mattlna, E.I.T. Graduate Engineer Office Phone: (972) 304-3681 Fax: (972) 304-7041