Loading...
Villas at LV-CS050406April 6, 2005 Mr. Daniel H¢ischman, P.E. Dowdey, Anderson & Associates, Inc. 5225 Village Creek Drive, Suite 200 Piano, Texas 75093 Re: Villas at Lake Vista, Phase One Construction Plan Review DAA Job No. 03067B Dear Mr. Heischman: Upon review of the construction plans for phase one of the Villas at Lake Vista subdivision, I have found that they are in compliance with the City of Lewisville's development ordinances and design regulations, and hereby grant approval for the following as referenced in the construction plans: · A street connection to Lake Vista Drive labeled as Lake Vista Place · An emergency access connection to Lake Vista Drive · Three (3) storm sewer connections · The removal of an existing storm inlet located in the proposed entry street and replaced with a storm sewer manhole · The lowering of the 12-inch water line on the south side of Lake Vista Drive in order to make necessary storm sewer connections · The construction of a 4-foot sidewalk within City of Lewisville fight-of-way along the south side of Lake Vista Drive · Any necessary grading to achieve compliance to City of Lewisville design standards. All workmanship within City of Lewisville fight-of-way shall conform to the City of Lewisville's design standards and shall be inspected by an official of the City of Lewisville. All required inspection fees shall be paid prior to construction. Please contact Jerry Roberts, Chief Construction Inspector, at 972-219- 3495 to set up a preconstruction meeting. Sincerely, City Engineer TSK/jbs Jerry Roberts Keith Marvin, City of Coppell Mark Wakeland, Wakeland Properties RO. Box 299002 Lewisville, Texas 75029-9002