Loading...
Amberpoint BP 2R-CS050407DEVELOPMENT REVIEW COMMIT-FEE ENGINEERING COMMENTS ITEM: Amberpoint Business Park~ Lot 2R, Block A, to allow the development of three office/warehouse buildings, totaling approximately 710,042-square feet on 64.3 acres of property located along the south side of Sandy Lake Road, between Freeport Parkway and Northpoint Drive, at the request of Jim Gaspard, Transwcstem Commercial Services. STAFF REP.: Matt Steer PROJECT ID# RP-05-0012 DRC DA TE: MARCH 31, 2005 and APRIL 7, 2005 CONTA CT: Kenneth M. Gri~n, P.E., Dir. o[ En~ineerinf/Public Works 972/304-3686 COMMENT STATUS: J n~,~r rn~r~ra ~ .............. Y ~'FINAL C3.01 1. The drainage information will be evaluated during the plan review process. C6.01 2. The maximum allowable spacing between fire hydrants is 300'. Some of the hydrants shown on the plans exceed this maximum. 3. Fire hydrants must be located outside of the collapse zone of the building (1.5 x Building Height). Additional comments may be generated upon detailed Engineering review. DEVELOPMENT REVIEW COMMITI'EE ENGINEERING COMMENTS ITEM: PD-194R3-LI~ Amberpoint Business Park~ Lot 2R, Block A zoning change request from PD-194R2-LI, (Planned Development-194 Revision 2- Light Industrial) to PD-194R3-LI (Planned Development-194 Revision 3- Light Industrial) to allow the development of three office/warehouse buildings, totaling approximately 710,042-square feet, on 64.3 acres of property located along the south side of Sandy Lake Road, between Freeport Parkway and Northpoint Drive, at the request of Jim Gaspard, Transwestem, Commercial Services. STAFF REP.: Matt Steer PROJECT ID# PD-05-0011 DRC DATE: MARCH 3L 2005 and APRIL 7, 2005 CONTACT: Kenneth M. Gri~n, P.E., Dir. o[ Enfineerin~/Public Works 972/304-3686 COMMENT STATUS: I PP~LIM~'r'a~RY ~'FINAL [ ~ 1. The driveways along Northpoint Drive will be reviewed in further detail during the Engineering plan review. Additional comments may be generated upon detailed Engineering review.