Amberpoint BP 2R-CS050407DEVELOPMENT REVIEW COMMIT-FEE
ENGINEERING COMMENTS
ITEM:
Amberpoint Business Park~ Lot 2R, Block A, to allow the development
of three office/warehouse buildings, totaling approximately 710,042-square
feet on 64.3 acres of property located along the south side of Sandy Lake
Road, between Freeport Parkway and Northpoint Drive, at the request of
Jim Gaspard, Transwcstem Commercial Services.
STAFF REP.: Matt Steer PROJECT ID# RP-05-0012
DRC DA TE: MARCH 31, 2005 and APRIL 7, 2005
CONTA CT: Kenneth M. Gri~n, P.E., Dir. o[ En~ineerinf/Public Works 972/304-3686
COMMENT STATUS: J n~,~r rn~r~ra ~
.............. Y ~'FINAL
C3.01
1. The drainage information will be evaluated during the plan review process.
C6.01
2. The maximum allowable spacing between fire hydrants is 300'. Some of the hydrants shown
on the plans exceed this maximum.
3. Fire hydrants must be located outside of the collapse zone of the building (1.5 x Building
Height).
Additional comments may be generated upon detailed Engineering review.
DEVELOPMENT REVIEW COMMITI'EE
ENGINEERING COMMENTS
ITEM:
PD-194R3-LI~ Amberpoint Business Park~ Lot 2R, Block A zoning
change request from PD-194R2-LI, (Planned Development-194 Revision 2-
Light Industrial) to PD-194R3-LI (Planned Development-194 Revision 3-
Light Industrial) to allow the development of three office/warehouse
buildings, totaling approximately 710,042-square feet, on 64.3 acres of
property located along the south side of Sandy Lake Road, between Freeport
Parkway and Northpoint Drive, at the request of Jim Gaspard, Transwestem,
Commercial Services.
STAFF REP.: Matt Steer PROJECT ID# PD-05-0011
DRC DATE: MARCH 3L 2005 and APRIL 7, 2005
CONTACT: Kenneth M. Gri~n, P.E., Dir. o[ Enfineerin~/Public Works 972/304-3686
COMMENT STATUS: I PP~LIM~'r'a~RY ~'FINAL [ ~
1. The driveways along Northpoint Drive will be reviewed in further detail during the Engineering
plan review.
Additional comments may be generated upon detailed Engineering review.