Loading...
Ballet TX-CS050414cOPPELL April 14, 2005 Ken Head Head Construction Inc 3030 LBJ Frwy Ste 700 Dallas TX 75234 fax 214-722-7635 RE: Ballet Academy of Texas Dear Mr. Head: A pre-construction conference on the referenced project has been scheduled for Tuesday, April 19, 2005 at 2:00 p.m. in the Lobby conference room in Town Center at 255 Parkway Blvd. Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any other interested parties so that they may have a representative present. If you have any questions concerning this project prior to the scheduled meeting, feel free to contact me at (972) 304-3684. ti Larry Davis, Construc 'on Inspector Office Phone: 972-304-3684 Fax: 972-304-3570 CC: Ken Griffm, Director of Engineering & Public Works Glenn Hollowell, Asst. Director of Public Works Greg Jones, Chief Building Official Lee Stone, Commercial Building Inspector Tim Oates, Fire Marshal See Page 2 255 PARKWAY ~ P.O BOX 478 ~ COPPELL TX 75019 ~ TEL 972/462 0022 1~ FAX 972/304 3673 RESPONSIBILITY FOR PRE-CONSTRUCTION MEETING NOTIFICATION 2 The owner / owner's representative will be notified of the date, time and place of the pm-construction meeting once it is scheduled by the Construction Inspector assigned to the project. It is the owner / owner representative's responsibility to notify the following parties: · Franchise Utilities (including but not limited to electric, gas, cable, & telephone providers) · Geotechnical firm · Project Engineer · Contractors or subcontractors for excavation, utility, & paving operations · SWPPP representative