Loading...
RC Townhomes-LR050408ENGINEERING AND MACTEC Engineering and Consulting 2200 Gravel Drive Fort Worth, Texas 76118-7123 Tel: 817-284-7755® Fax: 817-589-1420 CLIENT: PROJECT: SERVICES: REPORT OF CONCRETE COMPRESSIVE STRENGTH J.R. ROSE DEVELOPMENT 410 SPINNAKER DR. ALLEN, TX 75013 RIVERCHASE TOWNHOMES ADDITIONS COPPELL PAGE 1 OF 5 PROJECT NO.: 9023912 REPORT NO.: 502077 DATE OF SERVICE: 4/01/2005 AUTHORIZATION: REPORT DATE: 4/08/2005 Sample concrete at location of placement, perform required field tests, prepare and test concrete compressive strength specimens. CONTRACTOR: UNDERGROUND UTILITIES CONCRETE SUPPLIER: SOUTHEP~N STAR PLANT: 27 SPECIFICATION REQUIREMENTS STRENGTH: 3600psi @ 28 DAYS SLUMP: 3" AIR: NA METHOD OF TEST SAMPLING: ASTM C172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C1064 AIR CONTENT: ASTM C231 UNIT WEIGHT: ASTM C138 CAPPING/PADS: ASTM C1231 TESTING: ASTM C39 CYLINDER MARKED DATE AGE SET NO. TESTED (days) 1 1 4/08/2005 7 i 2 4/08/2005 7 1 3 4/29/2005 28 1 4 4/29/2005 28 PROJECT DATA CLASS OF CONCRETE: 7724 DATE OF PLACEMENT: 4/01/2005 TIME SAMPLED: 07:15A}4 BY: Brian Kasten TEMPERATURE(DegF)-AIR: 63 CONCRETE: 66 TRUCK NO: 931 TICKET NO: 773520 MEASURED SLUMP (in.): 3.50 AIR CONTENT(%): 5% UNITWEIGHT(pcf): 144.4 LOCATION OF PLACEMENT: PAVING BETHEL SCHOOL @ STA 8+50. REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE DIAMETER AREA (in.) (sq.in.) 6.00 28.27 6.00 28.27 Started: 06:00AM LOAD STRENGTH (lbs. force) (psi) FRACTURE TYPE REMARK;,S 124080 4390 ~ONE ~.~ 122340 4330 CONE/'- Stopped: 01:00PM Report Of Tests Continued On Page 2 Ourlettesand epa sae o heexcusveuseo hecen owhom hey are eddressed and shall not be reproduced excapt in ull without the app ova o he es ng aba a o y The use o ou name taus ace/Ye our written approval. Our letters and reports 1001 TT apply only to the samflle tested and/or inspected, and are not indica ire o he 0uant t es o appa eny iden ical o sirnila p oducts. MACTEC ~ ENGINEERING AND CONSULITNG J.R. ROSE DEVELOPMENT PROJECT NO. 9023912 DATE OF SERVICE: 4/01/2005 REPORT NO. 502077 PAGE 2 OF 5 SET NO. 2 REPORT OF CONCRETE COMPRESSIVE STRENGTH ( Cont i nued) CONTRACTOR: UN]DERGROITND UTILITIES CONCRETE SUPPLIER: SOUTHERN STAR PLANT: 27 SPECIFICATION REQUIREMENTS STRENGTH: 3600psi @ 28 DAYS SLUMP: 3" AIR: NA METHOD OF TEST SAMPLING: MOLDING & CURING: SLUMP: TEMPERATURE: A)R CONTENT: UNIT WEIGHT: CAPPING/PADS: TESTING: ASTM C172 ASTM C31 ASTM C143 ASTM C1064 ASTM C231 ASTM C138 ASTM C1231 ASTM C39 CYLINDER MARKED DATE SET NO. TESTED PROJECT DATA CLASS OF CONCRETE: ?72j- DATE OF PLACEMENT: 4/01/2005 TrMESAMPLED: 08:05AM BY: Brian Kasten TEMPERATURE (DegF) - AIR: 64 CONCRETE: 67 TRUCK NO: 1015 TICKET NO: 773527 MEASURED SLUMP (in,): 2.50 AIR CONTENT(%): 5% UNITWEIGHT(pcf): LOCATION OF PLACEMENT: PAVING BETHEL SCHOOL @ STA 7+75. REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH (days) (in.) (sq.in.) (lbs. force) (psi) FRACTURE TYPE 147.3 REMARKS 2 1 4/08/2005 2 2 4/08/2005 2 3 4/29/2005 7 6.00 28,27 133460 4720 CONE 7 6.00 28,27 137590 4870 CONE 28 2 4 4/29/2005 28 Technician: Brian Kasten Started: 06:00AM Stopped: 01:00PM Report Of Tests Continued On Page 3 Ou e e s and apo s are for the exclusive use of the client to whom they are addressed and shsll net be reproduced except in u w hou he app ova of he est~ng laboratory. The use of our name must receive our written ap rova~ Our ~etters and reports 1001 TT apply only tO the sample tested and/or inspected, and are not indicative of the quantities of appaFent~y dent ca or s m ar products. MACTEC ~ ENGINEERING AND CONSULTING J.R. ROSE DEVELOPMENT PROJECT NO. 9023912 DATE OE SERVICE: 4/01/2005 REPORT NO. 502077 PAGE 3 OF 5 SET NO. 3 REPORT OF CONCRETE COMPRESSIVE STRENGTH ( Cont i nued) CONTRACTOR: UNDERGROL~ND UTILITIES CONCRETE SUPPLIER: SOUTHERN STAR PLANT: 27 SPECIFICATION REQUIREMENTS STRENGTH: 3600psi @ 28 DAYS SLUMP: 3" AIR: NA METHOD OF TEST SAMPLING: MOLDING & CURING: SLUMP: TEMPERATURE: AIR CONTENT: UNIT WEIGHT: CAPPING/PADS: TESTING: ASTM C172 ASTM C31 ASTM C143 ASTM C1064 ASTM C231 ASTM C138 ASTM C1231 ASTM C39 CYLINDER MARKED DATE SET NO. TESTED PROJECT DATA CLASS OF CONCRETE: 7724 DATE OF PLACEMENT: 4/01/2005 TIME SAMPLED: 09:15AM BY: Brian Kasten TEMPERATURE(DegF)-AIR: 64 CONCRETE: 66 TRUCK NO: 1015 TICKET NO: 773536 MEASURED SLUMP (in.): 2.50 AIR CONTENT(%): 4.7% 145.2 LOCATION OF PLACEMENT: PAVING BETHEL SCHOOL @ STA 6+50. UNIT WEIGHT(pcf): REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH (days) {in.} (sq.in.) (lbs. force) (psi} FRACTURE TYPE REMARKS 3 1 4/08/2005 3 2 4/08/2005 3 3 4/29/2005 7 6.00 28.27 129480 4580 CONE 7 6.00 28.27 127270 4500 CONE 28 3 4 4/29/2005 28 Technician: Brian Kasten Started: 06:00AM Stopped: 01:00PM Report Of Tests Continued On Page 4 Our ~ettets end reports are foe the exclusive use of the client to whom they are addressed and shall not be reproduced except in u I Wi hou he approval of the test}nc laboratory The use of our name must receive our written approval, Our letters and reports 1001 TT apply only to the sample tested and/or inspected, end are not indicative of the quantities of apparently identical or sim er products, MACTEC J.R. ROSE DEVELOPMENT PROJECT NO. 9023912 DATE OFSERVICE: 4/01/2005 REPORT NO. 502077 PAGE 4 OF 5 SET NO. 4 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) CONTRACTOR: LTNDERGROUND LVEILITIES CONCRETE SUPPLIER: SOUTHERN STAR PLANT: 27 SPECIFICATION REQUIREMENTS STRENGTH: 3600psi @ 28 DAYS SLUMP: 3" AIR: NA METHOD OF TEST SAMPLING: MOLDING & CURING: SLUMP: TEMPERATURE: AIR CONTENT: UNIT WEIGHT: CAPPING/PADS: TESTING: ASTM C172 ASTM C31 ASTM C143 ASTM C1064 ASTM C231 ASTM C138 ASTM C1231 ASTM C39 CYLINDER MARKED DATE SET NO. TESTED PROJECT DATA CLASS OF CONCRETE: 7724 DATE OF PLACEMENT: 4/01/2005 TIME SAMPLED: 10: 10AM BY: Brian Kasten TEMPERATURE (DegF) -AIR: 61 CONCRETE: 65 TRUCK NO: 1020 TICKET NO: 773548 MEASURED SLUMP {in,): 3.00 AIR CONTENT(%): 5.2% UNITWEIGHT(pcf): LOCATION OF PLACEMENT: PAVING BETHEL SCHOOL @ STA 5+00. REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH (days) (in.) (sq.in.) {lbs, force) (psi) FRACTURE TYPE 145.2 REMARKS 4 1 4/08/2005 4 2 4/08/2005 4 3 4/29/2005 7 6.00 28.27 123600 4370 CONE 7 6.00 28.27 121870 4310 CONE 28 4/29/2005 28 Technician: Brian Kasten Started: 06:00AM Stopped: 01:00PM Report Of Tests Continued On Page 5 Our letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced excegpt in full without the approval of the testing laboratory. The use of our name must receive our written approval. Our letters andreports 1001 TT apply only Io the sample tested and/or inspected, and are not indicative of the quantities of apparently identical or similar ploducts MACTEC J.R. ROSE DEVELOPMENT PROJECT NO. 9023912 DATE OF SERVICE: 4/01/2005 REPORT NO, 502077 PAGE 5 OF 5 SET NO, 5 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Cent inued) CONTRACTOR: UNDERGROUND UTILITIES CONCRETE SUPPLIER: SOUTHERN STAR PLANT: 27 SPECIFICATION REQUIREMENTS STRENGTH: 3600psi @ 28 DAYS SLUMP: 3" AIR: ATA METHOD OF TEST SAMPLING: MOLDING & CURING: SLUMP: TEMPERATURE: AIR CONTENT: UNIT WEIGHT: CAPPING/PADS: TESTING: ASTM C172 ASTM C31 ASTM C143 ASTM C1064 ASTM C231 ASTM C138 ASTM C1231 ASTM C39 CYLINDER MARKED DATE SET NO. TESTED PROJECT DATA CLASS OF CONCRETE: 7724 DATE OF PLACEMENT: 4/01/2005 TIME SAMPLED: 11: 20AM BY: Brian Kasten TEMPERAIURE(DegF)-AIR: 64 CONCREIE: 67 TRUCK NO: 1827 TICKET NO: 73555 MEASURED SLUMP (in.): 3.00 AIR CONTENT(%): 5.1% UNITWE~GHT(pcf): LOCATION OF PLACEMENT: PAVING BETHEL SCHOOL @ STA 3+00. REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH {days) {in.) (sq.in.) {lbs. force) (psi) FRACTURE TYPE 145.2 REMARKS 5 i 4/o8/2o05 5 2 4/08/2005 5 3 4/29/2005 7 6.00 28.27 122890 4350 CONE 7 6.00 28.27 125210 4430 CONE 28 5 4 4/29/2005 28 Technician: Brian Kasten Started: 06:00AM Stopped: 01:00PM Report Distribution: I1} J.R. ROSE DEVELOPMENT I1 ) CITY OF COPPELL ENGINEERING DP {11 MARGARET GOFFfTOWNHOIV~ES ALLEN Tim Begole, CET. Ou e e s and apo $ are for he exclusive use of the client to whom they are addressed and shall not be reproduced exceDpt in ull without the approval o the test ng abe a o y The use of our name must receive our written approval, Our letters anareports 1001 TT apply only to the sample tested and/or inspected, and are not indicative of the quantities of aDparenHy dent ca or s m ar products.