Loading...
Coppell Trade-LR050412REPORT OF IN-PLACE DENSITY TESTS Report Number: 94051081.0023 Service Date: March 24, 2005 Client: Coppell Trade Center LP Attn: Al Sorrels 5055 Keller Springs Rd Ste 300 Addison TX 75001 lrerracan 8901 Carpenter F~/y, Ste #100 Dallas, Texas 75247 (214) 630-1010 Report Date: April 12, 2005 Project: Coppell Trade Center NWC Sandy Lake & State St Coppell, TX Project Number: 94051081 Services: In-place density tests. On this date, HBCFFerracon's technician arrived at the above referenced job site as scheduled for in-place density tests. After arriving at the job site, HBCFFerracon's technician was notified that in-place density tests were cancelled due to the contractor was not ready. HBCFFerracon's technician observed the earthwork operation for Building C. Technician: Michael E. Odom (1) Coppel~ Trade Cen er LP 1) Merriman Assoc In¢ ~.,.~/~//~'~//.~,~'~ // (1) PritchardAsso~ialeslnc (1) McFadden&Miller Reviewed by: ,~' ,-'~.-c,- / "- "' f (1) City of Coppetl TX Robert D. Ray, S.E:~ (1) City of Coppel[ TX Senior Project M~er The tests were performed m general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use-of the client indicated above and shall not be reproduced except in fuli without the written consent of our company. Test results transmitted herein are only appiicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 REPORT OF PRECONSTRUCTION MEETING Report Number: 94051081.0024 Service Date: March 26, 2005 Client: Coppell Trade Center LP Attn: Al Sorrels 5055 Keller Springs Rd Ste 300 Addison TX 75001 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Report Date: April 12, 2005 Project: Coppell Trade Center NWC Sandy Lake & State St CoppelL TX Project Number: 94051081 Services: Preconstruction meeting. As requested, HBC/'1'erracon's project manager for the above referenced project attended the preconstruction meeting held by the City of Coppell. Testing requirements as well as other topics were discussed at this meeting. Technician: Robert D. Ray, S.E.T. Report Distribution: ,,,~ ~'. ' (1) Coppel[ Trade Center LP (1) Merriman Assoc Inc .... ~.~ ~.,..~J (1) Pritchard Associates Inc (1) McFadden & Miller RevleweQ Dy: ,~' ~ V f ~ - (1) Cily of Coppell TX Robert D. Ray, S.E.T.,,,~ (1) City of Coppetl TX Senior Project ~ ,. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the u~of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94051081.0030 Service Date: April 4, 2005 Client: Coppell Trade Center LP Attn: Al Sorrels 5055 Keller Springs Rd Ste 300 Addison TX 75001 lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-t 010 Report Date: April 12, 2005 Project: Coppell Trade Center NWC Sandy Lake & State St Coppell, TX Project Number: 94051081 Material Information Specified Strength: 4200 psi (~ 28 Days Batch Time: 4:15 am Plant: 1 Supplier: Redi-Mix Truck No: 223 Mix I.D. No.: 115 Water Added Onsite Before Test: Water Added Onsite After Test: 0 Gallons Field Test Data Test Result Slump, inches: 2.25 Air Content, %: 0.8 Concrete Temperature,° F: 84 Ambient Temperature, o F: 76 Plastic Unit Weight, pcf: 146.0 Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq. inches) 1 1 6.00 28.27 1 2 6.00 28.27 1 3 1 4 Ticket No: 144638 0 Gallons Sample Information Sample Time: 6:15 pm Date Cast:April 4, 2005 Technician: Michael E. Odom Weather Conditions: Cloudy Accumulative Yards: 20 Placement Method: Direct Discharge Sample Locations: 16+75 Placement Location: Cast-in-Place Manholes for 8" S Sewer Service, SI Line 0+00 and 16+75 Specification Test Method 5.0 Max ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Date Tes,~"~ Load Tested (__~__~_~ 04/1112005 I 7/125,910 0411112005 i, 7,/125,300 05~02/2005 ~8verage 05/02/2005 28 Maximum Compressive Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Michael E. Odom Report Distribution: (1) Coppell Trade Center LP (1) Merriman Assec Inc (1) Pritchard Ass~iates Inc (1) McFadden & Miller Reviewed by: (1) City of Coppell TX Robert D. Ray, S. (1) City of Coppell TX Senior Project ~ The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the u~'-of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Paoe 1 of 1