ST9302-CS 980305 (3)SANDY LAKE - FROM DENTON TAP TO MACARTHUR BLVD CATEGORY NUMBER OF L.F. CONST. 1. PAVING 6 3,250 1,116,835 CONFLICT 14 2. DRAINAGE 3 150 93,000 CONFLICT 8 3. STREET LIGHT 19 665 412,300 FOUNDATION CONFLICT 7O The existin~ design calls for lowering the entire limit of 10, 160LF at a cost of S2e6 M. due to pavin~ drainage and streetlilg~t foundation conflicts. The original 7 section lowerings of 5,370 LF, based on the project report dated 7/21/94 was to account for pavin~ and drainage conflict, however requiring a minimum cover requirement of 8 FT. due to the standard air valve design. NOTES AND ASSUMPTIONS: PAVING: 1.. The 6 section lowerings are at the following station (Paving Con6i__'cts)': 8+75 to 12+25= 350LF 20+50 - New air valve installation to replace the existh~ A/V 29+25 to 33+50-- 425LF 43+00 - New air valve Installation to replace the existing A/V 68+50 to 74+25= 575LF 79+25 to 86+50= 725LF 95+00 to IO0+(X) = 500 LF 101+25 to 108+00--- 675 LF Total = 3,250 LF (~ $343/LF, consisting of 17 bid items based on current prices Page 1 of 3 2. The shutdown period estimate was based on faotfiMin8 co~ with John_non B~otbers, Bar Contractors, in-house design and construction personnel and ~ mee~ with ~ Division. Reference attaehed memo to M. Riehman 3. New air valves will be installed at stn. 10+50, 20+50 (re-install), 33+00, 43+00(re-install), and 71+00. The new A/V system each will cost $16,000. inol. 2 manholes.. 4. A new configuration for the Air Valve' system will be utilized to minimize cover ~ to only 3.8 Ft. This Air Valve design was first installed in the Denton/Rossford project on the ex. 66" main in 1997. , 5. Prior to fie-in, a total of 200,000 gal. dewatefing will be accon~lished with the iustall~on of blow-off valves at low points. Note: Do not use greater than 1300 GPM d~ fOr the pump. · 6. Two existing air valves not included in the lowerings will be re-installed using the new A/V design. DRAINAGE: 1. Tbe3 drainage conflicts are at station: 18+03, 21" RCP 46+19, 21"RCP 55+40, 66"RCP 101+17 - Direct conflict with 27"RCP - (1Ft. direct conflict) - Redesign may be pos~dblo O'c~earance) - P, edesip may be possibb (4FT. Direct confli~).- Lowering may be required or need major Lowering no. 6 to be extended by 75 LF to Estimated Cost: $31,000dowering consisting ofatotal of 150LF pipe~ 300/LF and 6 clo~ures (~ $8,000 each Page 2 of 3 []11 I II ii][: STREET LIGHT FOUNDATIONS: The proposed street lisht 24' drilled sha~ approximately 8 Ft. deep are in cxmfliot at 27 different locations from sta. 7+23 to 94+65 which is almost the entire limit of this project. However, 8 of these conflicts will be cleared in conjunction with the 6 lowerings in item #1, leaving only 19 conflicts to be cleared. Estimated Cost: $620/LF per relocation of 35LF each GENERAL NOTES: 1. Special Provisions will be included to protect the existing main from heavy equipments dugn8 p'adin8 operations, l~nlmum 2.0~t. cover will be ~ to not allow total ext. load capsc~ to exceed 660(O/ft. Sheepsfoot rollers will not be permitted; skid boards will be installed to distn'oute the load, etc. 2. Design Services estimates approximately 4weeks to complete in-house design for the 6 lunBattad- 3~5~8 Page 3 of 3