Freeport NIP(8.0)-CS050418T H IE - C I T Y · 0 F
COPPELL
MEMORANDUM
TO:
FROM:
Ken Griffin, P.E., Director of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Director of Public Works
Keith Marvin, P.E., Civil Engineer
Charlene LaMattina, E.I.T.
Greg Jones, Chief Building Official
Tim Oates, Fire Marshal
Larry Davis, Construction Inspeetor~4~
Office Phone: (972) 304-3684
Fax: (972) 304-3570
DATE: April 18, 2005
WALK-THRU for Freeport XI & XII (Duke Freeport, Lot 6&7 Block A)
A final walk-thru for paving, utilities and drainage on the referenced project has been
scheduled for:
Thursday, April 21~ at 2:00 p.m.
Please let me know if I can be of further assistance.
cc: Greg Burk, Duke Construction fax ~
GOPPEL/,