Loading...
WA0101-CS050429T H E C I T Y O F CO?FELL ,April 29, 2005 Mr. Jim Cummings, President F.W.R.M. Inc. P.O. Box 6173 San Antonio, Texas 78209-0173 RE: State Highway 121 Water Line WA 01-01 Notice o£ Construction Dear Mr. Cummings: The S.H. 121 Water Linc project is scheduled to start on May 9, 2005, with a construction time of 140 calendar days. A portion of the water line will be constructed in utility easements on property that is owned by you. Fox Contractors, Inc. will construct the project and they anticipate starting at Coppell Road and working towards Denton Tap Road. Your consideration of this malter is appreciated and should you have any questions or need any additional information, please advise. Sincerely, Suzam~aylor CIP Coordinator Engineering Department Direct: 972-304-7019 Fax: 972 304-3570 E-mail: sta¥1or(~i ci.coppell.tx.us T H E C I T Y 0 F COPPELL April 29, 2005 Mr. Ted R. Pittman Second Century Investments Denton Tap, Ltd. 7502 Greenville Avenue, Suite 680 Dallas, Texas 75231-3832 RE: State Highway 121 Water Line WA 01-01 Notice of Construction Dear Mr. Pittman: The S.H. 121 Water Line project is scheduled to start on May 9, 2005, with a construction time of 140 calendar days. A portion of the water line will be conslructed in utility casements on property that is owned by you. Fox Contractors, Inc. will construct the project and they anticipate starting at Coppell Road and working towards Denton Tap Road. Yonr consideration of this matter is appreciated and should you have any questions or need any additional information, please advise. Sincerely, S uz anLTa~:,lo r CIP Coordinator Engineering Department Direct: 972-304-7019 Fax: 972-304-3570 E-maih staylor a)ci.coppeIl.tx.ns cOPPE/.~. COl'FELL April 29, 2005 Mr. Bryan Thompson Magnolia Parks HOA 150] LBJ #250 Dallas, Texas 75234 RE: State Highway 121 Water Line WA 01-01 Notice of Construction Dear Mr. Thompson: The S.H. 121 Water Linc project is scheduled to start on May 9, 2005, with a construction time of 140 calendar days. A portion of thc water line will be constructed in utility easements on property that is owned by the Magnolia Park (Coppell Grcens) Home Owner's Association. Fox Contractors, Inc. will construct the project and they anticipate starting al Coppcll Road and working towards Denton Tap Road. Your consideration of this matter is appreciated and should you have any questions or need any additional infom~ation, please advise. Sincerely, Suzan ~a~ylor CIP Coordinator Engineering Department Direct: 972-304-7019 Fax: 972-304-3570 E-mail: stavlor~[,,ci.coppe]l Ax.us cOPPEL/, 1~-t S. 2 oOS T H E ¢ I T Y O F COPFELL April 29, 2005 Mr. Bill Levy Coppell Greens HOA 206 Tumberry Coppel], Texas 75019 RE: State Highway 12I Water Line WA 01-01 Notice of Construction Dear Mr. Levy: The S.H. 121 Water Linc project is scheduled to start on May 9, 2005, with a construction time of 140 calendar days. A portion of the water line will be constructed in utility casements on property that is owned by the Magnolia Park (Coppell Greens) Home Owner's Association. Fox Contractors, Inc. will construct the project and they anticipate starting at Coppell Road and working towards Denton Tap Road. Your consideration of this matter is appreciated and should you have any questions or nccd any additional information, plcase advisc. Sincerely, Suzafi. ~avlor CIP Coordinator Engineering Departmcnt Direct: 972-304-7019 Fax: 972-304-3570 E-mail: stavlor;a}ci.coppelI.tx.us cOPPE&& 19.S 5.2 oOS COPPELL May 4, 2005 Mr. Robert H. Staton, Jr. 14522 Cyprus Point Drive Farmers Branch TX 75234-2205 RE: State Highway 121 Water Line WA 01-01 Notice of Construction Dear Mr. Staton: The S.H. 121 Water Line project is scheduled to start on May 9, 2005, with a construction time of 140 calendar days. A portion of the water line will be constructed in utility easements on property that is owned by you. Fox Contractors, Inc. will construct the project and they anticipate starting at Coppell Road and working towards Denton Tap Road. Your consideration of this matter is appreciated and should you have any questions or need any additional information, please advise. Sincerely, Suzan T~ylor CIP Coordinator Engineering Department Direct: 972-304-7019 Fax: 972-304-3570 E-mail: sta¥1or¢~ci.coppell.tx.us