Loading...
MA 03/04-LR041228Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavement Services Corp. PROJECT: City of Coppell Street Repair Project Job #03-007, Coppell, TX LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: DATE: SUPPLIER: Paving, southbound Mockingbird Lane at intersection of Meadowlark 02.1077 28 December 2004 SAMPLE DATA: Truck No. Ticket No. Time Batched Time Sampled Concrete Temp. (ASTM CLO64) Air Content (ASTM C231) Unit Weight (ASTM C138~ Ambient Temp. SET 1 SET 2 MIX NO. Cement Flyash Sand in. 1.0 in. Water Admix //1 Admix //2 AEA COMPRESSIVE STRENGTH TESTS IASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number inches Days Date Pounds Stren.gth 28-Day (ASTM C143) psi Strength 426 7 01/04/05 427 28 01/25~05 428 28 01/25/05 139,700 494O 199,100 7040 182,100 6440 28-Day Average 674Q 4000 NOTE: Cylinders and all information furnished by contractor. TECHNICIAN: DISTRIBUTION: Contractor (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148