Loading...
MA 03/04-LR041216Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Pavement Services Corp. DATE: 16 December 2004 PROJECT: City of Coppell Street Repair Project Job #03-007, Coppell, TX MATERIAL DESCRIPTION: 1) Cement Treated Base JOB NO.: 02.1077 ASTM D 698 STANDARD PROCTOR: 1) 120.0 pcf @ 11.0% Moisture MOISTURE LOCATION PROCTOR LIFT CONTENT % PavinR Replacement ~ 238 Southern Belle Dr. 215) south paving replacement-south end 1 CTB 12.0 216) south paving replacement-north end 1 CTB 13.0 217) north paving replacement-center 1 CTB 12.2 DRY PERCENT REQUIRED DENSITY COMPACTION COMPACTION PCF % % 120.1 100.1 117.1 97.6 115.9 96.6 95+ TECHNICIAN: DISTRIBUTION: CDJ (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148