MA 03/04-LR041213Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Pavement Services Corp.
PROJECT: City of Coppell Street Repair Project
Job #03-007, Coppell, TX
LOCATION OF POUR SET 1:
LOCATION OF POUR SET 2:
JOB NO.:
DATE:
SUPPLIER:
02.1077
13 December 2004
Pavement Services
Paving, eastbound Cambria Drive @ 422 residence
SAMPLE DATA:
Truck No.
Ticket No.
Time Batched
Time Sampled
Concrete Temp. (ASTM C1064)
Air Content (ASTM C231)
Unit Weight (ASTM C1
Ambient Temp.
SET 1 SET 2
MIX NO.
Cement
Flyash
Sand
Water
Admix #1
Admix #2
AEA
COMPRESSIVE STRENGTH TESTS {ASTM C39)
(Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Stren.gth 28-Day
(ASTM C143} ps1 Strength
417 7 12/20/04
418 28 01/10/05
419 28 01/10/05
120,400 4250
169,QOQ 598Q
168,1Q0 5950
28-Day Average 5970
4000
NOTE: Cylinders and all information furnished by contractor.
TECHNICIAN:
DISTRIBUTION:
Contractor
(1) Pavement Services Corp.
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148