Loading...
MA 03/04-LR041211Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT; Pavement Services Corp. PROJECT: City of Coppell Street Repair Project Job #03-007, Coppell, TX LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: DATE: SUPPLIER: Paving, eastbound Barringt0n @ 1351 residence 02,1077 11 December 2004 Pavement Services SAMPLE DATA: Truck No. Ticket No. Time Batched Time Sampled Concrete Temp. (ASTM C1064) Air Content (ASTM C231) Unit Weight (ASTM C138) Ambient Temp. SET 1 SET 2 MIX NO. Cement Flyash Sand in. 1.0 in. Water Admix //1 Admix //2 AEA COMPRESSIVE STRENGTH TESTS IASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day {ASTM C143) psi Strength 41 4 7 12/18~04 415 28 01 ~08~05 41 6 28 01 ~08~05 124,100 4390 165,90Q 5878 167,300 592Q 28-Day Average 5890 4OOO NOTE: Cylinders and all information furnished by contractor. TECHNICIAN: DISTRIBUTION: Contractor (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148