Loading...
MA 03/04-LR041208Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavement Services Corp. PROJECT: City of Coppell Street Repair Project Job #03-007, Coppell, TX LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: 02.1077 DATE: 8 December 2004 SUPPLIER: Pavement Services Paving, northbound Simmons @ 248 residence SAMPLE DATA: Truck No. Ticket No. Time Batched Time Sampled Concrete Temp. (ASTM C1064) Air Content (ASTM C2311 Unit Weight IASTM C138) Ambient Temp. SET 1 SET 2 MIX NO. Cement Flyash Sand 1.0 ~n. Water Admix #1 Admix #2 AEA COII~PRESSIVE STRENGTH TESTS (ASTM C39} (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 411 7 12/15/04 412 28 01/05/05 413 28 01/05/05 103,800 3670 165,800 5790 162,500 5750 28-DayAverage 5770 4000 NOTE: Cylinders and all information furnished by contractor, TECHNICIAN: DISTRIBUTION: Contractor (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214).351-6419 Fax (214) 351-5148