Loading...
MA 03/04-LR041124Hooper Engineering Laboratories, Inc. CLIENT: PROJECT: MATERIAL DESCRIPTION: 1) Cement Treated Base Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS Pavement Services Corp. City of Coppell Street Repair Project Job #03-007, Coppell, TX 1) 120.0 pcf @ 11.0% Moisture ASTM D 698 STANDARD PROCTOR: DATE: 24 November 2004 LOCATION PROCTOR JOB NO.: 02.1077 MOISTURE DRY PERCENT REQUIRED LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % Pavinq Patch @ 249 Simmons Drive 209) north 1 Final 14,2 117.0 97.5 210) middle 1 Final 12.4 122.9 102.4 211 ) south 1 Final 12.9 115.0 95.8 95+ TECHNICIAN: DISTRIBUTtON: MFM (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148