Loading...
MA 03/04-LR041116Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavement Services Corp. PROJECT: City of Coppell Street Repair Project Job #03-007, Coppell, TX LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: 02.1077 DATE: 16 November 2004 SUPPLIER: Pavement Services Paving pourback, northbound lane of Auburn Street, in front of 308 Auburn Street SAMPLE DATA: SET 1 Truck No. 2003 Ticket No. Time Batched 8:39am Time Sampled 8:40am Concrete Temp. (ASTM C1064) 69°F Air Content {ASTM C231 ) 1.7 % Unit Weight (ASTM C138) Ambient Temp. SET 2 MIX NO. Cement Flyash Sand 1.0 in. Water Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 405 7.00 7 11 ~23~04 406 7.00 28 12/14~04 407 7.00 28 12/14~04 103,500 3660 153,800 5440 150,700 5330 28-Day Average 5390 4OO0 TECHNICIAN: DISTRIBUTION: RJW (7:00am-09:30am) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214),351-6419 Fax (214) 351-5148