Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
MA 03/04-LR041113
CLIENT: Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS Pavement Services Corp. PROJECT: City of Coppell Street Repair Project Job #03-007, Coppell, TX MATERIAL DESCRIPTION: 1) Cement Treated Base ASTM D 698 STANDARD PROCTOR: 1) 120.O pcf ~ 11.0% Moisture LOCATION PROCTOR LIFT DATE: 13 November 2004 JOB NO.: 02.1077 MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % Pavino Replacement Areas 206) @ 311 Martel Lane 1 CTB 14.4 115.2 96.0 207) @ 308 Martel Ct. 1 CTB 12.4 114.5 95.4 208) @ 308 Auburn Way 1 CTB 10.4 114,0 95.0 95+ TECHNICIAN: DISTRIBUTION: CDJ (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148