Loading...
MA 03/04-LR041229Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Pavement Services Corp. DATE: 28 December 2004 PROJECT: City of Coppell Street Repair Project Job #03-007, Coppell, TX MATERIAL DESCRIPTION: 1) Cement Treated Base JOB NO.: 02.1077 ASTM D 698 STANDARD PROCTOR: 1) 120.0 pcf @ 10.0% Moisture 218) 219) LOCATION PROCTOR LIFT Pavin;t Replacement Areas L~ Mockingbird and Meadowlark south paving replacement 1 CTB 13.3 north paving replacement 1 CTB 10.4 MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 105.8 88.2* 109.8 91.5* 95+ *Test results indicate fill is not compacted to required density/moisture. Contractor notified. TECHNICIAN: DISTRIBUTION: CDJ (1) Pavement Services Corp, (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148