MA 03/04-LR041229Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
CLIENT: Pavement Services Corp.
DATE: 28 December 2004
PROJECT: City of Coppell Street Repair Project
Job #03-007, Coppell, TX
MATERIAL DESCRIPTION: 1) Cement Treated Base
JOB NO.: 02.1077
ASTM D 698 STANDARD PROCTOR: 1) 120.0 pcf @ 10.0% Moisture
218)
219)
LOCATION PROCTOR LIFT
Pavin;t Replacement Areas L~ Mockingbird
and Meadowlark
south paving replacement 1 CTB 13.3
north paving replacement 1 CTB 10.4
MOISTURE DRY PERCENT REQUIRED
CONTENT DENSITY COMPACTION COMPACTION
% PCF % %
105.8 88.2*
109.8 91.5*
95+
*Test results indicate fill is not compacted to required density/moisture. Contractor notified.
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Pavement Services Corp,
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148