Loading...
RC Townhomes-LR050428 CTEC ERING AND CONSULTING MACTEC Engineering and Consulting 2200 Gravel Drive Fort Worth, Texas 76118 7123 Tel: 817 284 7755® Fax: 817 5891420 REPORT OF CONCRETE COMPRESSIVE STRENGTH CLIENT: J.R. ROSE DEVELOPMENT 410 SPINNAKER DR. ALLEN, TX 75013 PROJECT: RIVERCHASE TOWNHOMES ADDITIONS COPPELL PAGE 1 OF 1 PROJECT NO.: 9023912 REPORT NO.; 502697 DATE OF SERVICE: 4/21/2005 AUTHORIZATION: REPORT DATE: 4/28/2005 SERVICES: Sample concrete at locaLio~ cf placement, perform required field tests, prepare and test concrete compressive strength specimens. CONTRACTOR: UNDERGROLTND UTILITIES CONCRETE SUPPLIER: TXI PLANT: 41 SPECrFICATION REQUIREMENTS STRENGTH: 3000psi (~v 28 DAYS SLUMP: 3" AIR: NA METHOD OF TEST SAMPLING: ASTM C172 MOLDING & CURfNG; ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C1064 AIR CONTENT: ASTM C231 UNIT WEIGHT: ASTM C138 CAPPING/PADS: ASTM C1231 TESTING: ASTM C39 PROJECT DATA CLASS OF CONCRETE; NA DATE OF PLACEMENT: 4/21/2005 TIME SAMPLED: 12: 00PM BY: OTHERS TEMPERATURE (DegF) AIR: 82 CONCRETE: 74 TRUCK NO: 3? TICKET NO: 30736 MEASURED SLUMP(in,): 4.00 AIR CONTENT(%): 4.6% UNIT WEIGHTIpcf); NA LOCATION OF PLACEMENT; STAMp CONCRETE RED APPROACH SLA~. REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH 6 X 12 CYLINDERS CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH SET NO, TESTED (d~ ( i (I)C ~¢~TURE TYPE 1 1 4/28/200S ~n')00 ;ssq";"7 ~'sf;r~ ' ~ 1 2 5/19/2005 Technician: James Smith Start~ ll:30AM Stot~d: ~:~PM Report Distribution: ~~' ~,%C TSm Be~ole, CET. REMARKS ACTEC ERING AND CONSULTING MACTEC Engineering and Consulting 2200 Gravel Drive Fort Worth, Texas 76118-7123 TeE 817 284 7755eFax:817-589 1420 CLIENT: PROJECT: SERVICES: REPORT OF CONCRETE COMPRESSIVE STRENGTH J.R. ROSE DEVELOPMENT 410 SPINNAKER DR. ALLEN, TX 75013 RIVERCHASE TOWNNOMES ADDITIONS COPPELL PAGE 1 PROJECT NO.: 9023912 REPORT NO.: 502592 DATE OF SERVICE: 4/21/2005 AUTHORIZATION: REPORT DATE: 4/28/2005 Sample concrete at location of placement, perform required field tests, prepare and test concrete compressive strength specimens. CONTRACTOR: J.R. ROSE DEVELOPMENT CONCRETE SUPPLIER: TXI PLANT: 41 SPECIFICATION REQUIREMENTS STRENGTH: 3600ps± C~ 28 DAYS SLUMP: 3" AIR: NA METHOD OF TEST SAMPLING: ASTM C172 MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 TEMPERATURE: ASTM C1064 AIR CONTENT: ASTM C231 UNIT WEIGHT: ASTM C138 CAPPING/PADS: ASTM C1231 TESTING: ASTM C39 CYLINDER MARKED DATE SET NO. TESTED · · 4/28/2005 1 2 4/28/2005 1 3 5/19/2005 28 PROJECT DATA CLASS OF CONCRETE: NA DATE OF PLACEMENT: 4/21/2005 TIME SAMPLED: 12:00PM BY: James Smith TEMPERATURE (DegF/ AIR: 82 CONCRETE: 74 TRUCK NO: 37 TICKET NO: 30736 MEASURED SLUMP (in.): 4.00 AIR CONTENT(%): 4, 6% UNIT WEIGHT{peri: NA LOCATION OF PLACEMENT: STAMP CONCRETE RED APPROACH SL~B. REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH 6 X 12 CYLINDERS MAXIMUM COMPRESSIVE AGE DIAMETER AREA LOAD STRENGTH Idays) lin.) (sq.in.) (Jbs. force) (psi) FRACTURE TYPE 7 6.00 28.27 99640 3520 CONE 7 6.00 28.27 98260 3480 CONE REMARKS 5/19/2005 28 Technician: James Smith Started: ll:30AM Stopped: i2:50PM Report Distribution: I1 ~ J R ROSE DEVELOPMENT b NIACTEC · ~ B~o±e, CET.