Four Seasons 2R-LR050407 (2)REPORT OF REINFORCING STEEL OBSERVATION lrerracon
8901 Carpenter Fru~, Suite #100
Dallas, Texas 75247
Date of Service:
Client No,:
Client:
04/07/05
72873
Hill & Wilkinson LTD
800 Klein Rd Ste 100
Piano, TX 75074
Report No..'
Project No.:
Project:
94041388.0101
94041388
BCE Specialties
989 West Sandy Lake Road
Coppell, TX
Services:
Drawings Utilized:
Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Civil Drawings
Locations/Items Observed: Paving @ S & SW corner of Main Building (including fire lane)
Test Method: Visual Observation
REPORT OF OBSERVATION
ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT
Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing & Type
Bar Size X Proper Bar Placement X stirrup Spacing & Type
Bar Grade X Properly Tied X Welded Splices
Rebar C~ean X Dowe~ Bars in Place X Mechanical Splices
Trash & Debris RemOved X Proper Bar Supports X Lapped Splices X
Number of Bars X Proper Cover/Clearance X
Discrepancies/Comments: Any discrepancies found were corrected at the tirne of this observation unless otherwise
noted.
Field Results Report To:
Technician: Terry Smith Insp/Testing
Report Distribution:
(1) Hill & Wilkinson LTD
(1) City of Coppell TX
(1) City of Coppell TX
309el
lrerracan
(1) Hardy McCullah/MLM Architects
(1) TMBP Consulting Engineers
(1) BCE Specialists
~ -Ro~e~~ ~. ~ay, S~.
Senior Project~g~
This repoR is exclusively for the use of the client indicated above and shall not be reproduced without written approva[ of HBC~erracon