Loading...
ST9302-CS 980108 (6)City of Dallas January 8, 1998 VIA FAX AND MAIL Fax No. (972) 304-3570 Mr. Kenneth Griffin, P.E, Assistant City Manager P.O. Box 478 Coppell, Texas 75019 Re · Sandy Lake Road As discussed with you in our meeting of December 18, 1997, at this point we are to fund the construction cost of relocating the existing 30" water main in order to accommodate the Sandy Lake Road project. Our current construction estimate is $2.6 Million for the 10,165 LF of 30" bar wrapped concrete cylinder pipe. Concerning the engineering fee of $165,000 we regret that we can not help defray the cost based on previOUs commitments that the City of Coppell include this in its existing contract with Kimley Horn And Associates. Attached is a copy of the minutes of the meeting dated January 6, 1994 and a chronology of events regarding this project. Please note that the existing water main is in excellent condition and that the relocation was driven by paving cuts and conflicts with the street light foundations throughout the entire limits of the project, thus necessitating the relocation to accommodate Coppell's paving and drainage improvements. Our current review of 100% plans submitted by Kimley Horn has been completed. We will be furnislfing you the specifications as soon as we obtain approval of the ILA for our joint cOntract venture. Please provide us with the latest draf~ of the ILA for our review and we will coordinate with the City Attorneys'office for their review. Feel free to contact me at (214) 948-4388 if you have any questions. Project Manager //d¢~I/~ r c: Jim Milstead Jun Battad File Water Utilities Department Development Services · 320 E. Jefferson, Room 218 · Dallas, Texas 75203 · 214 948-4590 A city utility providing regional water and wastewater services vital to public health and safety.