Loading...
Four Seasons 2R-CS050505COPPELL MEMORANDUM TO: FROM: DATE: REF: Ken Griffin, Director of Engineering Glenn Hollowell, Asst. Director of Public Works Greg Jones, Chief Building Official Tim Oates, Fire Marshal Larry Davis, Construction Inspector Office Phone: (972) 304-3684 Fax: (972) 304-3570 May 5, 2005 WALK-THRU for Four Seasons, Lot 2R (BCE Specialties) Comer of Royal Ln and Sandy Lake Rd A final walk-thru for paving, utilities and drainage on the referenced project is scheduled for Wednesday, May 11, 2005 at 2:00 p.m. Please let me know ifI can be of further assistance. CC2 Charles Hoagland, Hill & Wilkinson, Ltd. Matt Letlow, Potter Concrete Bob Beserra, San Saba Construction fax 214-299-4437 fax 214-689-1066 fax 972-509-8088