ST9302-CS 981211k
P.O. BOX~
:255 P, AP. KWAY BLVD.
COPPHLI~ TX
PAX NO. (972)
ENGINEERING DEPARTMENT
FAX COVER SHEET
TO:
PHONH NO.:
FAX NO.:
DATE: O-: LI -~0
TRANSNfflTED BY: ({~%i
N%~ER OF PAGES 0NCLUDINO COVERS~~: ~5
YOU DO NOT RECEIVE ALL OF THE PAOES, PLEASB CALL (972) 304.3679.
DEC 11 ~98 08:BSAM KIM~-HORM
817 335 5070
FT WORTH
P.1/~
[Ol Chm'Ty Sr, t'e~
~oL't Worth, TX 76102.6[03
Fax Transmittal
To: Fax #
Oqlanization,
lob No.
/
TO: Fax ~ 24,~[Si'Z. -- 'Tf~z.8 Name
To: Fax~ ~'7~./i"la- 4~'~t Name ~'~°"fI~ ~,~t~,,..
To: Fax# q'{z./%,,, -SSTa Name.
Organization C-~-~. ~ a=?t~.
To: Fax # Name
Organization
To~ Number of Pales Including ~is Cover Sheet
Si&ned ~
rhi~ fecs~rn#e is intended only lot the ad~lres~ee named heretn anti ~y ~in inaCtiOn t~t iS Conferral
htended ~tp~nt or t~ em~o~e or a~nt ~es~nsee for ~ to t~ a~re~, ~u am h~by noW~ Rat thy renew,
d~semmat~n, di~lotu~, or ~ng d thi~ commun~at~n ~s f~ictty w~ibi~d. If ~u ham mce~ this fa~ile
pt~se mme~af~ ~fi~ us by teleph~e, and return the ordinal facsimiM to us at ~e ad~ abm mee
Se~e. Thank you.
DEC 11 '98 08:B6AM KIMLEY-HORM FT WORTH
CITY OF COPPELL, TEXAS
MONTHLY PROGRESS MEETING AGENDA
Project: Sandy Lake Road Paving, Drainage, and Water System
Coppell No. ST-93-02
Date: December 1,, 1998
A. Materials Installed
c.B' ProblemsEquipment on Site
Encountered and R~solut/on
D. Status of Submittals
II.
REVIEW SCHEDULE
A, Actual vs. Projected Schedule
B. Problems Impedint Progress
C, Corrective Measures Needed to Regain Schedule
D. Work Expected in Next Month
E. Submittal Tabulation
IH. PROIECT ISSUES
A. 16" Water Line
B, 66" and 21" Storm Sewers
C. Project Signs
D. Contractor's Site Office
E. Utility l~locations (TU Electric/Lone Star Gas)
F. Change Orders
IV. PUBLIC RELATIONS
V. FUTURE AGENDA ITEMS
VI. MILESTONES FOR NEXT MONTH
VII. QUESTIONS