Loading...
ST9302-CS 981211k P.O. BOX~ :255 P, AP. KWAY BLVD. COPPHLI~ TX PAX NO. (972) ENGINEERING DEPARTMENT FAX COVER SHEET TO: PHONH NO.: FAX NO.: DATE: O-: LI -~0 TRANSNfflTED BY: ({~%i N%~ER OF PAGES 0NCLUDINO COVERS~~: ~5 YOU DO NOT RECEIVE ALL OF THE PAOES, PLEASB CALL (972) 304.3679. DEC 11 ~98 08:BSAM KIM~-HORM 817 335 5070 FT WORTH P.1/~ [Ol Chm'Ty Sr, t'e~ ~oL't Worth, TX 76102.6[03 Fax Transmittal To: Fax # Oqlanization, lob No. / TO: Fax ~ 24,~[Si'Z. -- 'Tf~z.8 Name To: Fax~ ~'7~./i"la- 4~'~t Name ~'~°"fI~ ~,~t~,,.. To: Fax# q'{z./%,,, -SSTa Name. Organization C-~-~. ~ a=?t~. To: Fax # Name Organization To~ Number of Pales Including ~is Cover Sheet Si&ned ~ rhi~ fecs~rn#e is intended only lot the ad~lres~ee named heretn anti ~y ~in inaCtiOn t~t iS Conferral htended ~tp~nt or t~ em~o~e or a~nt ~es~nsee for ~ to t~ a~re~, ~u am h~by noW~ Rat thy renew, d~semmat~n, di~lotu~, or ~ng d thi~ commun~at~n ~s f~ictty w~ibi~d. If ~u ham mce~ this fa~ile pt~se mme~af~ ~fi~ us by teleph~e, and return the ordinal facsimiM to us at ~e ad~ abm mee Se~e. Thank you. DEC 11 '98 08:B6AM KIMLEY-HORM FT WORTH CITY OF COPPELL, TEXAS MONTHLY PROGRESS MEETING AGENDA Project: Sandy Lake Road Paving, Drainage, and Water System Coppell No. ST-93-02 Date: December 1,, 1998 A. Materials Installed c.B' ProblemsEquipment on Site Encountered and R~solut/on D. Status of Submittals II. REVIEW SCHEDULE A, Actual vs. Projected Schedule B. Problems Impedint Progress C, Corrective Measures Needed to Regain Schedule D. Work Expected in Next Month E. Submittal Tabulation IH. PROIECT ISSUES A. 16" Water Line B, 66" and 21" Storm Sewers C. Project Signs D. Contractor's Site Office E. Utility l~locations (TU Electric/Lone Star Gas) F. Change Orders IV. PUBLIC RELATIONS V. FUTURE AGENDA ITEMS VI. MILESTONES FOR NEXT MONTH VII. QUESTIONS