Loading...
WA0101-CS050324 (2)Page 1 of 1 Paula Crocker - Fwd: 121 Water line bids From: Suzan Taylor To: Paula Crocker Date: 3/24/2005 1:20 PM Subject: Fwd: 121 Water line bids >>> "Doug Showers" <DShowers@BHCLLP.COM> 3/24/2005 1:14:18 PM >>> Suzan, You should be receiving a copy of the bid tab and summary very soon this afternoon. I have reviewed it and the bid by Fox is balanced. There are two bid items that were not consistent with our opinion of cost. I-3, Boring, is very high (by approx $100/ft), even though our previous information for boring supports our estimate. 1-24, Erosion Control, is also very high compared to our estimate. Otherwise, all looks in order. I will put together the recommendation letter today and send it off to you. Once the Council has approved the project bid, we will prepare the contracts for Fox to sign, and then get them back to the City for your signature. Let me know if there is anything else I need to be doing to prepare for the preconstruction conference. Sincerely, Doug Showers file://C:~Documents%20and%20SettingsXPCROCKER~Local%20Settings~Temp\GW} 0000-.. 3/24/2005