Loading...
CiCi's Addition-CS050506Page From: To: Date: Subject: "Konstantine Bakintas" <kb@bhbinc.com> "'Keith Marvin'" <kmarvin@ci.coppell.tx.us> 5/6/2005 4:00:05 PM RE: FW: CiCi's Pizza Parking Lot Addition (1080 W. BethelRoad) Thank you! Konstantine Bakintas, PE BHB Engineering & Surveying Tel (817)338-1277, Fax (817)338-9245 www.bhbinc.com, kb@bhbinc.com ..... Original Message From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Friday, May 06, 2005 3:00 PM To: kb@bhbinc.com Subject: Re: FW' CiCi's Pizza Parking Lot Add t on (1080 W. BethelRoad) Konstantine, A construction development permit will be required and inspectors from this department will inspect the installation. Once you have prepared the plans, submit 2 sets for our review. I don't think the review will take very long with such a small project, but we do need to follow the normal procedure. No detention will be required. Feel free to call with any questions or comments. Keith R. Marvin, P.E. City of Coppell (972) 304-7044 kmarvin@ci.coppell.tx.us >>> "Konstantine Bakintas" <kb@bhbinc.com> 05/06~05 2:21 PM >>> Hello Keith, Please review the attached parking lot expansion project and let me know if any sort of permitting is required. Matt tells me that there are no site approval requirements; the proposed parking lot was approved with the original project. Also we are proposing to capture the storm water with a curb inlet and connect to the on-site storm drain lines. Will stormwater detention be required? Thank you, Konstantine Bakintas, PE BHB Engineering & Surveying Tel (817)338-1277, Fax (817)338-9245 <http://www.bhbinc.com/> www.bhbinc.com, <mailto:kb@bhbinc.com> kb@bhbinc.com ..... Original Message ..... From: Konstantine Bakintas [mailto:kb@bhbinc.com] Sent: Friday, May 06, 2005 10:36 AM To: Matt Steer (MSTEER@ci.coppell.tx.us) Subject: CiCi's Pizza Parking Lot Addition (1080 W. Bethel Road) Hello Matt, Please review the attached and let us know if a Site Plan Approval will be required. The proposed addition (outlined in red) is simply a parking lot addition approx. 120' X 100'. Are there any other City permits required? The storm drainage will be collected by a curb inlet and piped to an on-site storm drain. Will stormwater detention be a requirement? Thank you, Konstantine Bakintas, PE BHB Engineering & Surveying Tel (817)338-1277, Fax (817)338-9245 <http://www.bhbinc.com/> www.bhbinc.com, <mailto:kb@bhbinc.com> kb@bhbinc.com