Loading...
WA0101-CS050315 (2)r Suzan Taylor t2f Water I~eYbo~e p,ts ~n-d easem~ts~ [ .................... Page_ From: "Doug Showers" <DShowers@BHCLLP COM> To: <kmarvin~ci coppell tx us> <stayrorL~ci coppell tx us> Date: 3/15/2005 52731 PM Subject: 121 Water line bore pits and easements Suzan and Keith, We have moved the line 8 feet to the west where it crosses 121 Please have a look at the attached pdt drawings of the bore crossing SH121 We betieve that no easement changes are required on the north end On the south end a handshake with FRWM for the temporary easement ~s probably needed Once you agree to this alignment change we w,II modify sheets 13 and 19 for addendum #2. We will also g~ve you an 8-1/2 x 11 sheet of the south temporary construction easement to discuss with FRWM Look for~Nard to your comments Suzan Taytor - Addendum No 1 SH 121 Waterline From: To: Date: Subject: Suzan and Keith, "Doug Showers" <DShowers@BHCLLP COM> <kmarvin~ci coppelt tx us>, <staylor@ci copp¢ tx us> 3/15/2005 235:32 PM Addendum No 1 SH 121 Waterline In my absence from the office, I sent out Addendum No1 without prewewing it I knew that we had a City of Coppell standard format for the Addendum and was sure ~t was located in the file system where it would be located easity Unfortunately it was not Iocated and our staff used the BHC standard format My apologies We will switch to the City of Coppell format for all future addenda Suzan Taylor - Re SH 121 Water Line Page 1 To: Date: Subject: Suzan, "Doug Showers" <DShowers~BHCLLP COM> <staylor~cilcoppell tx us> 3/15/2005 10:36:43 AM Re: SH 121 Water Line We are outlining the potrntial easements this mormng I will contact you this afternoon to discuss Doug >>> "Suzan Taylor" <stayfor@ci coppell tx us> 3/15/2005 10:1644 AM >>> Doug: Have you had a chance to look at the additional easements we will need for the bore pits I think that we will be better off if we only have to deal w~th the owner of FRWM He was the first to sign the easements and Ken and I both have talked with him Once we determine what is needed we need to contact him The easements could hang us up on this project Thanks